Clonlea Reerve Encloed Dog Park DRAFT Concept Plan Rev. C
LEGEND... Future encloed Dog Park Helipad Acce road entry. Toilet facility 5. 6.. 8. Tenni court Car parking Skate park Playground (unfenced) 9. 0.. BBQ/Picnic area Vehicle turn-a-round Caueway North Pa ra River m x. 50 appro ap pr ox. 00 m Murray R d 9 0 rth Pa ra Ri ve r 8 No 5 6 Landcape Context Plan NTS Dwg no. : Rev: 60- SK0 C
LEGEND Exiting tree New tree A Organic mulch Boulder Chain meh perimeter fence (.5m high).m new compacted rubble circulation path 5 Seat with backret (from council depot) Murray Rd Log Drinking fountain with tilt dog bowl 9 Entry/exit gate with double gated, elf cloing dog airlock for afety Opportunity for future parallel parking Bin and dog dipoal bag 8 Compacted rubble path link to exiting hared ue path & road 5 6 Maintenance gate (m wide) 6x6m hade helter with eat 6 Irrigated exiting gra A Park Area: 65qm 8 Irrigated hydroeeded mound 9 Fence line of big and mall Dog Park DRAFT Landcape Concept Plan Dwg no. : 60- SK0 :500 @ A Rev: C
Park Shelter Bin with integrated dog bag dipener Drinking fountain with tilt dog bowl Double gated Dog Airlock entry Park Seat Lawn mound Timber Log Seat Informal eating rock (upplied by council) Signage Entry with artwork (Subject to future funding) Chain Link Fence Precedent Dwg no. : Rev: 60- SK0 C
Opinion of Probable Cot: Preliminary Concept Deign Clonlea Reerve Encloed Dog Park Project Clonlea Reerve Encloed Dog Park Contact Fiona De Roa/Gemma Kleinig Attention Jack Darzano, Date 9/09/ Pleae refer to the diclaimer at the end of thi document ITEM No. DESCRIPTION QTY UNIT RATE AMOUNT.00 Compacted rubble path including path to car park & hared path (.m wide) 0 m $5.00 $5,00.00.00 Spade Edge 0 lin m $0.00 $,00.00 Shelter ( x m) with concrete pad under no.00 + entry paved threhold $,500.00 $5,000.00.00 Drinking Fountain with tilt dog bowl no $,500.00 $,000.00 5.00 Organic mulch 95 m $5.00 $,65.00 6.00 Log (allowance) 9 no $00.00 $,00.00.00.5m High Boundary fence (allowance) incl. concrete plinth 80 lin m $5.00 $5,000.00 8.00 New tree (0mm Pot) no $5.00 $0.00 9.00 Hydroeeded gra mound no $,000.00 $,000.00 0.00 Irrigation (allowance) include controller (battery operated) no $6,000.00 $6,000.00 SUBTOTAL $99,5.00 TOTAL (not inc. GST) $99,5.00 Excluion / Work by Council Preliminarie Lighting Conultant' fee Bin Earthwork Seat with backret ($,000 intalled) Planting/Mulched garden bed New intant turf (plu topoil) Rock Signage Parallel parking Water connection Contruction contingency Maintenance and etablihment cot Thi opinion provide illutrative calculation and indicative cot and hould not be ued a a ubtitute for a full and final coting of the work. It i not a recommendation by Apect Studio Pty Ltd to participate in or to abtain from the project and cannot be relied upon a a definitive tatement of the total cot of the project. Apect Studio Pty Ltd doe not accept any reponibility for and exprely diclaim and exclude all liability for any ue of or reliance on thi opinion or any lo or damage of whatever nature (including conequential lo), howoever incurred, which i uffered by any peron acting on or refraining from acting becaue of anything contained in thi opinion. Landcape Preliminary Coting Dwg no. : 60- SK0 Rev: C Page
Elevation A-A NTS Landcape Context Plan Dwg no. : 60- SK05 NTS Rev: -