ANALYSIS OF BIDS CITY OF LONG BEACH, HARBOR DEPARTMENT

Similar documents
Kansas Department of Transportation DISTRICT C / SRTS-C030(802) Project(s): Min: Max:

Kansas Department of Transportation DISTRICT 1. Project(s): 081 KA / Min: Max:

Kansas Department of Transportation DISTRICT 1. Project(s): 081 U / TA-U230(601) Max: Min:

Kansas Department of Transportation. Counties: DISTRICT 4. Project(s): Min: Max:

South Carolina Department of Transportation. Tabulation of Bids

Kansas Department of Transportation PHILLIPS, SMITH, STATEWIDE DISTRICT 3. Project(s): K KA / Max: Min:

Kansas Department of Transportation DISTRICT 6. Project(s): Max: Min:

Kansas Department of Transportation DISTRICT C / HSIP-C479(701) Project(s): Min: Max:

Kansas Department of Transportation DISTRICT 4. Project(s): Max: Min:

Kansas Department of Transportation DISTRICT 5. Project(s): Min: Max:

Versatile Coir Wattles Offer Cost-Effective Sediment Control at Construction Sites

Wattle Application on Linear Projects

Paul Revere Village - Rules and Regulations

BRITTINGHAM PARK DOG PARK IMPROVEMENTS

ALL ABOUT: FOAM SEDIMENT CONTROL WATTLES

QUINCY HOUSING AUTHORITY POLICY ON PETS IN FAMILY HOUSING

RESIDENTIAL CHICKEN PERMIT APPLICATION LICENSE FEE $25.00

Beat the. Up with. For More information contact your PSR or or

ALL ABOUT: FOAM SEDIMENT CONTROL WATTLES

August 14, Addendum No. 1. for. Chicago Standard Gate Valves and Accessories. Specification No A. RFQ No. 4608

Your American Made Source

Industrial Batteries Network Power Marathon M FT AGM Modular Power.

Guardian Contract. This agreement, effective between David & Melinda Poling ( Breeders ) and

3.9 Fencing. Figure 9 - Concrete waterer with float valve. The length is variable.

4MRVWG Dog Park Committee

GUARDIAN CONTRACT. Phone Numbers home cell other

KREISEL Rotary valve vs. screw pump

Proposal for Dog Park at Virginia Avenue Park

The Regency House Condominium Association PET Rules and Regulations Effective April 1, 2013

SPECIFICATIONS FOR THE ORGANIZATION OF THE FCI TRADITIONAL STYLE (TS) HERDING EUROPEAN CHAMPIONSHIPS FCI HEC TS

APPLICATION TO LEASE. Date: Address: Present Owners: Phone: Lessee(s) Phone: 2. Weight: Who will reside in the unit (names and ages)

RECOMMENDED STANDARD MITIGATION MEASURES FOR PROJECTS IN SONORAN DESERT TORTOISE HABITAT

Triline Pumps. Vacuum & Pressure Gas moving Engineers. Diaphragm Pumps EVM Series

Vibratory Tumbler OWNER S MANUAL

CLARE CEMETERY REGULATIONS. Burial Authority Aims

A Guide to Commercial Poultry Production in Florida 1

Auburn Dog Park Committee

San Francisco 2014 Litter Study

CHECKLIST FOR EQUINE RESCUE FACILITIES

Updated Guidance on the practice of animal dissection in standard school science experiments

Dog Park Draft Criteria and Location Options

HYDRAULIC DESIGN INFORMATION SHEET

COUNTY OF ALBEMARLE STAFF REPORT SUMMARY

PET POLICY & AGREEMENT

United States Department of Agriculture Animal and Plant Health Inspection Service. Inspection Report. Customer ID:

Pet, Service Animal, and Assistance Animal Policy

CHAPTER 14: MONITORING AND MANAGEMENT OF LISTED SPECIES

Design Guide. You can relax with a INSTALLATION QUALITY,CERTIFIED QTANK POLY RAINWATER TANKS. qtank.com.au

Other people in your household Name Relationship to you Age

1.Heat/Suffocation 2.Natural Disasters 3.Disease 4.Chemical Residues

DEPARTMENT: Domestic Animal Services EXTERNAL FEE NUMBER: EX 1-1* DATE APPROVED: ; ; ; ; ; ;

Table of Contents Operating Guide Training Guide

NOTICE OF DECISION BEFORE THE SKAGIT COUNTY HEARING EXAMINER. c/o Bruce Lisser P. O. Box 1109 Mount Vernon, WA 98273

A STUDY OF RUTTING OF ALABAMA ASPHALT PAVEMENTS

SHCA Working Pack Dog Program

Poultry Watering Systems Catalogue

FARM ASSURANCE FOR SHEEP ONLY

City of Seaford News

3M Industrial Tapes for Marking. Delivering the durability you need and the versatility you want.

Arch Metal Aquarium Stand - 10 / / E ASY A SSEMBLY I NSTRUCTIONS AND P ARTS L IST

Needs Assessment Study for. New Animal Shelter. For Shelby County, OH. January 26, 2015

Cause Analysis of Asphalt Pavement Rutting on Section N5 in Pakistan

ADOPTION and FOSTER HOME APPLICATION Missing fields will not allow DHDR to process your application.

CASE NUMBER: 18SN0724 APPLICANTS: David John and Debra E. Sirois CHESTERFIELD COUNTY, VIRGINIA MATOACA DISTRICT

Valley of the Moon Park Site Plan Update Advisory Group Meeting #1 March 18, 2014 Spenard Recreation Center

Poultry Watering Systems Catalogue

(c) Ensure that necessary and standard veterinary care is provided in a timely manner

Local Government Pension Scheme Pensioner Cash Equivalent Factors on Divorce from 1 October 2010

LAMAR COUNTY BOARD OF COMMISSIONERS Regular Commissioner Meeting Minutes June 17 th, :00 p.m.

BUILDING REFURBISHMENT PROTECTING YOUR CONCRETE ASSETS

RULES AND REGULATIONS OF LAWNRIDGE CEMETERY City of Rochelle, Illinois EFFECTIVE January 01, 2018

San Mateo County Environmental Health

Meter Risers, Fittings & PE Pipe for Underground Gas Applications

THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL INTRODUCED BY SCHWANK, COSTA, BLAKE, BREWSTER AND VULAKOVICH, JUNE 2, 2017

TITLE XVII HUNTLEY CEMETERY GUIDELINES. Updated and Approved Ordinance (O)

THE KEEPING OF ANIMALS, CATS, POULTRY AND BEES BYLAW 2018

Natural disasters such as hurricanes and wildfires

SERVICE LETTER HC-SL Propeller - Unfeathering Tool TE316

Bufo Toads shoot a venom that is highly toxic to Dogs, Cats and other animals and causes skin irritations in humans

THE LAWNS CEMETERY 1 FILEY TOWN COUNCIL

To ensure a safe and comfortable environment at the Co-op for members and their pets.

Post mortem examinations


ZAXIS 670LC kw (463 hp) 345 kw (463 hp)

Turtle Mitigation for Road and Highway Projects Pembroke District MNR Interim Guidelines Version 1.0 (April 2014)

Rules and Regulations Oakridge Cemetery Marshall, Michigan

FLAG SALUTE - RULES - OPEN PUBLIC MEETINGS ACT. OPEN TO PUBLIC There were no comments from the public.

Burlington Recreation Commission Meeting April 10, Commissioners in Attendance: Chair Kristine Brown, David Norden, and Paul Raymond

COUNTY OF LINCOLN, NORTH CAROLINA

102 Animals on University Property

OFF-LEASH DOG PARKS DRAFT CRITERIA DRAFT LOCATION OPTIONS

Plainville Dog Park. Proposal and Information

Role of the Veterinary Statutory Bodies (VSB) for Good Veterinary Governance.

GEOG 490/590 SPATIAL MODELING SPRING 2015 ASSIGNMENT 3: PATTERN-ORIENTED MODELING WITH AGENTS

Pressure Tanks. ASME Code Stainless Steel, Galvanized and ASME PT Series Tanks. A R 10/11

GUIDELINES AND CHECKLIST FOR CONDUCTING A NSDTRC(USA) HOME VISIT FOR POTENTIAL ADOPTERS OF RESCUE TOLLERS

THE CORPORATION OF THE TOWN OF WHITCHURCH-STOUFFVILLE BY-LAW NUMBER LI

Page: 1 of 6. (Signature/Date)

Preventing Sulfa Residues in Pork

EBARA FLOW SWITCH CONTROLLED BOOSTER SYSTEM

Transcription:

Page 1 of 8 NO. 1 - Mobilization / Demobilization: Furnish all labor, materials, tools, equipment, and incidentals necessary for mobilization / demobilization, as specified and shown, for the lump sum price of: NO. 2.1 - Work Sequence No. 1 ( 5 ft. deep trench excavation): Excavate Valve cluster / group #3 Lump Sum 19,894.00 19,894.00 32,000.00 32,000.00 22,000.00 22,000.00 NO. 2.2 - Work Sequence No. 1 ( 5 ft. deep trench excavation): Bracing/Shoring System ( 5 ft. deep trench excavation NO. 2.3 - Work Sequence No. 1 ( 5 ft. deep trench excavation): Investigate condition of Valve #3B Lump Sum 8,783.00 8,783.00 4,100.00 4,100.00 18,000.00 18,000.00 Lump Sum 3,449.00 3,449.00 2,100.00 2,100.00 4,230.00 4,230.00 NO. 2.4 - Work Sequence No. 1 ( 5 ft. deep trench excavation): Repair Valve #3B Extension Rod EA 263.00 263.00 750.00 750.00 6,000.00 6,000.00 EA 1,502.00 1,502.00 550.00 550.00 1,000.00 1,000.00

Page 2 of 8 NO. 2.7a - Work Sequence No. 1 ( 5 ft. deep trench excavation): Furnish 20" BF Valve NO. 2.7b - Work Sequence No. 1 ( 5 ft. deep trench excavation): Replace 20" BF Valve #3A EA 6,046.00 6,046.00 5,700.00 5,700.00 5,618.00 5,618.00 NO. 2.8 - Work Sequence No. 1 ( 5 ft. deep trench excavation): Backfill / Compaction / Pavement Repair EA 11,464.00 11,464.00 6,200.00 6,200.00 6,000.00 6,000.00 NO. 2.9 - Work Sequence No. 1 ( 5 ft. deep trench excavation): Construction Traffic Regulation & Control Lump Sum 9,927.00 9,927.00 6,600.00 6,600.00 15,250.00 15,250.00 NO. 2.1 - Work Sequence No. 1 ( 5 ft. deep trench excavation): Stormwater BMP Checklist Compliance Lump Sum 2,842.00 2,842.00 16,250.00 16,250.00 12,200.00 12,200.00 Lump Sum 971.00 971.00 1,800.00 1,800.00 3,000.00 3,000.00

Page 3 of 8 NO. 3.1 - Work Sequence No. II ( 5 ft. deep trench excavation): Excavate Valve cluster / group #6 NO. 3.2 - Work Sequence No. II ( 5 ft. deep trench excavation): Bracing/Shoring System ( 5 ft. deep trench excavation NO. 3.3a - Work Sequence No. II ( 5 ft. deep trench excavation): Furnish 20" BF Valve Lump Sum 4,692.00 4,692.00 4,100.00 4,100.00 20,000.00 20,000.00 Lump Sum 3,389.00 3,389.00 1,400.00 1,400.00 3,000.00 3,000.00 NO. 3.3b - Work Sequence No. II ( 5 ft. deep trench excavation): Replace 20" BF Valve #6A & #6B EA 6,045.50 12,091.00 5,700.00 11,400.00 5,928.00 11,856.00 NO. 3.4a - Work Sequence No. II ( 5 ft. deep trench excavation): Furnish 12" RSGV EA 8,526.00 17,052.00 5,500.00 11,000.00 6,000.00 12,000.00 EA 4,520.00 4,520.00 4,100.00 4,100.00 4,038.00 4,038.00

Page 4 of 8 NO. 3.4b - Work Sequence No. II ( 5 ft. deep trench excavation): Replace 12" RSGV #6C, and legally dispose of ACP pipe NO. 3.5 - Work Sequence No. II ( 5 ft. deep trench excavation): Backfill / Compaction / Pavement & Landscape Repair EA 6,588.00 6,588.00 7,200.00 7,200.00 5,000.00 5,000.00 NO. 3.6 - Work Sequence No. II ( 5 ft. deep trench excavation): Construction Traffic Regulation & Control Lump Sum 9,037.00 9,037.00 3,100.00 3,100.00 8,500.00 8,500.00 NO. 3.7 - Work Sequence No. II ( 5 ft. deep trench excavation): Stormwater BMP Checklist Compliance Lump Sum 1,778.00 1,778.00 11,600.00 11,600.00 2,500.00 2,500.00 NO. 4.1 - Work Sequence No. III ( 5 ft. deep trench excavation): Excavate Valve cluster / group #14 Lump Sum 971.00 971.00 1,800.00 1,800.00 3,000.00 3,000.00 Lump Sum 5,691.00 5,691.00 7,900.00 7,900.00 10,000.00 10,000.00

Page 5 of 8 NO. 4.2 - Work Sequence No. III ( 5 ft. deep trench excavation): Bracing/Shoring System ( 5 ft. deep trench excavation NO. 4.3a - Work Sequence No. III ( 5 ft. deep trench excavation): Furnish 20" BF Valve Lump Sum 3,671.00 3,671.00 2,200.00 2,200.00 2,000.00 2,000.00 NO. 4.3b - Work Sequence No. III ( 5 ft. deep trench excavation): Replace 20" BF Valve #14A & #14B EA 5,480.50 10,961.00 5,800.00 11,600.00 5,680.00 11,360.00 NO. 4.4a - Work Sequence No. III ( 5 ft. deep trench excavation): Furnish 90 20" SCCP bend, 4" blow-off, fittings EA 8,808.50 17,617.00 4,600.00 9,200.00 5,000.00 10,000.00 NO. 4.4b - Work Sequence No. III ( 5 ft. deep trench excavation): Remove and legally dispose of 20" SCCP fittings, BO's, etc. & replace w/90 20" SCCP bend, 4" BO, fittings, & thrust block. Lump Sum 13,386.00 13,386.00 41,744.00 41,744.00 8,000.00 8,000.00 Lump Sum 2,883.00 2,883.00 38,000.00 38,000.00 18,000.00 18,000.00

Page 6 of 8 NO. 4.5 - Work Sequence No. III ( 5 ft. deep trench excavation): Remove & salvage 20" RSGV #14D NO. 4.6 - Work Sequence No. III ( 5 ft. deep trench excavation): Backfill / Compaction & Pavement Repair EA 1,854.00 1,854.00 1,400.00 1,400.00 3,500.00 3,500.00 NO. 4.7 - Work Sequence No. III ( 5 ft. deep trench excavation): Construction Traffic Regulation & Control Lump Sum 12,209.00 12,209.00 6,000.00 6,000.00 4,000.00 4,000.00 NO. 4.8 - Work Sequence No. III ( 5 ft. deep trench excavation): Stormwater BMP Checklist Compliance Lump Sum 345.00 345.00 900.00 900.00 1.00 1.00 NO. 5.1 - Work Sequence No. IV ( 5 ft. deep trench excavation): Excavate Valve cluster / group #11 Lump Sum 971.00 971.00 1,750.00 1,750.00 2,000.00 2,000.00 Lump Sum 6,797.00 6,797.00 4,100.00 4,100.00 18,000.00 18,000.00

Page 7 of 8 NO. 5.2 - Work Sequence No. IV ( 5 ft. deep trench excavation): Bracing/Shoring System ( 5 ft. deep trench excavation NO. 5.3a - Work Sequence No. IV ( 5 ft. deep trench excavation): Furnish 20" BF Valve Lump Sum 2,824.00 2,824.00 4,000.00 4,000.00 3,000.00 3,000.00 NO. 5.3b - Work Sequence No. IV ( 5 ft. deep trench excavation): Replace 20" BF Valve #11B & #11C EA 5,480.50 10,961.00 5,700.00 11,400.00 5,618.00 11,236.00 NO. 5.4a - Work Sequence No. IV ( 5 ft. deep trench excavation): Furnish 6" Gate Valve EA 8,526.00 17,052.00 5,300.00 10,600.00 8,000.00 16,000.00 NO. 5.4b - Work Sequence No. IV ( 5 ft. deep trench excavation): Replace 6" Gate Valve #11D EA 1,752.00 1,752.00 1,750.00 1,750.00 1,546.00 1,546.00 EA 3,275.00 3,275.00 3,500.00 3,500.00 12,200.00 12,200.00

Page 8 of 8 NO. 5.5 - Work Sequence No. IV ( 5 ft. deep trench excavation): Backfill / Compaction & Pavement Repair NO. 5.6 - Work Sequence No. IV ( 5 ft. deep trench excavation): Construction Traffic Regulation & Control Lump Sum 9,022.00 9,022.00 5,700.00 5,700.00 6,000.00 6,000.00 NO. 5.7 - Work Sequence No. IV ( 5 ft. deep trench excavation): Stormwater BMP Checklist Compliance Lump Sum 2,041.00 2,041.00 11,000.00 11,000.00 4,000.00 4,000.00 NO. 6 - Water Truck Service: Provide Water Truck Service (2000 Gallon Capacity) Lump Sum 971.00 971.00 1,800.00 1,800.00 3,000.00 3,000.00 DAY 1,000.00 10,000.00 750.00 7,500.00 1,000.00 10,000.00 $259,542.00 $313,794.00 $317,035.00 10% Bond 10% Bond 10% Bond