FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) SUWANNEE COUNTY Highways: Interstate 4413371 I-10 FROM: MADISON COUNTY LINE TO: US90 RESURFACING 5.861 100 PE 13,918 CST 4386081 I-10 SUWANNEE COUNTY EAST BOUND REST AREA REST AREA.262 200 PE 177 ROW 10,776 DSB 4424111 I-10 SUWANNEE COUNTY EASTBOUND REST AREA LANDSCAPING.245 200 PE 620 CST 4349981 I-10(SR8) @ CR137 INTERCHANGE LIGHTING.010 847 CST 9 CST 4343271 I-10(SR8) @ US129 INTERCHANGE LIGHTING.765 9 CST 4349971 I-10(SR8) @ US90 INTERCHANGE EXIT 275 LIGHTING.001 1,115 CST 9 CST Highways: State Highways 4135271 D2-SUWANNEE COUNTY TRAFFIC SIGNAL MAINTENANCE AGREEMENT TRAFFIC CONTROL DEVICES/SYSTEM.000 59 OPS 61 OPS 63 OPS 64 OPS 66 OPS 4342961 SR10(US90) FROM: MADISON CL TO: CR49 RESURFACING 15.035 20 PE 13,363 CST 53 CST 4356822 SR20(US27),SR247,CRAVEN ST,HOUSTON AVE,SIDEWALK VARIOUS LOCATIONS SIDEWALK 1.408 112 PE 2 PE 421 CST 4365041 SR249/SR51(US129) @ US90 IN LIVE OAK XING NO622926L RAILROAD CROSSING.010 350 RRU 4343281 SR51(US129) FROM: LIVE OAK CL TO: I-10 INTERCHANGE LIGHTING 1.868 7 CST Highways: Off State Hwy Sys/Off Fed Sys 4381731 CR136A FROM: US129 TO: 75TH RD ROAD RECONSTRUCTION - 2 LANE 2.955 950 CST 4373241 LIVE OAK DRAINAGE WELLS PH 1 DRAINAGE IMPROVEMENTS 1.000 402 CST 1 CST 4373242 LIVE OAK DRAINAGE WELLS PH 2 DRAINAGE IMPROVEMENTS 1.000 402 CST 4373243 LIVE OAK DRAINAGE WELLS PH 3 DRAINAGE IMPROVEMENTS 1.000 502 CST 4373244 LIVE OAK DRAINAGE WELLS PH 4 DRAINAGE IMPROVEMENTS 1.000 502 CST 4382101 129TH RD FROM: CR252 TO: SR51 RESURFACING 6.971 2,191 CST 4392801 180TH STREET OVER LITTLE RIVER BRIDGE NO374002 BRIDGE REPLACEMENT.024 557 PE 25 ROW 62 ROW 50 ROW 3,625 CST 4413261 80TH TERRACE & 139TH DRIVE FROM: END OF PAVEMENT TO: MITCHELL ROAD ROAD RECONSTRUCTION - 2 LANE 1.299 1,300 CST Maintenance: Interstate 2152321 SUWANNEE ROUTINE MAINTENANCE 25.523 100 MNT 100 MNT 100 MNT 100 MNT 100 MNT Maintenance: State Highways 4144131 LIGHTING AGREEMENTS SUWANNEE COUNTY LIGHTING.000 58 MNT 60 MNT 61 MNT 63 MNT 65 MNT 2147091 SUWANNEE ROUTINE MAINTENANCE.000 400 MNT 400 MNT 600 MNT 600 MNT 600 MNT
FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) SUWANNEE COUNTY Freight, Logistic And Passenger Operation: Aviation 4418351 SUWANNE CO APT DESIGN & CONSTRUCT NEW HANAGAR AVIATION REVENUE/OPERATIONAL.000 750 CAP 4349181 SUWANNEE CNTY APT DESIGN & CONST HANGARS UPIN 24J605 AVIATION REVENUE/OPERATIONAL.000 400 CAP 4331281 SUWANNEE CNTY APT REHAB EXISTING GA TERMINAL PFL0006463 AVIATION PRESERVATION PROJECT.000 100 CAP 400 CAP 4400601 SUWANNEE CO APT DSGN & CONST HANGER TAXI LN & DRAINAGE PFL0010601 AVIATION CAPACITY PROJECT.000 1,000 CAP 4400621 SUWANNEE CO APT PAVEMENT REHAB OF T-HANGER TAXI LANES PFL0011446 AVIATION PRESERVATION PROJECT.000 500 CAP 4400591 SUWANNEE CO APT T-HANGER CONSTRUCTION PFL0003026 AVIATION REVENUE/OPERATIONAL.000 641 CAP Freight, Logistic And Passenger Operation: Transit 4272663 SUWANNEE FED SECT 5311 RURAL TRANSIT FUNDING OPERATING/ADMIN. ASSISTANCE.000 485 OPS 509 OPS 535 OPS 561 OPS 589 OPS
Selection Criteria Report Element Requested Value Report Description: Styled PDF Detail Report: By Local Name Component Groups: Highways=Yes; FLP=Yes; Turnpike=Yes; Maintenance=Yes; Planning=Yes; FCO=Yes; Research and Testing=Yes; Fl Rail Enterprise=Yes; Transportation Disadvantaged=Yes; Miscellaneous=Yes; Version: G1 Fiscal Year: 2019 Number of Years: 5 District: Budgeting District 02 County: N/A Snapshot: 10/01/2017 20:15:01 Allocation Type: H Report Format: PDF Transportation System: Not specified (Select All) Contract Class: B Work Mix: Not specified (Select All) Phase Group: Not specified (Select All) Phase Type: Not specified (Select All) Program Number: Not specified (Select All) Fund Group: Not specified (Select All) Item Status - from: Not specified Item Status - to: Not specified Item Group: Not specified (Select All)
Phase Group Descriptions Phase Phase Phase Description Group Type Exceptions ADM Administration A Any Excl pgm 52;Ph A8 w/pgm 39 CAP Capital 9 Any CST Construction 5,6 Any Excl Ph 5A,5D,56,57; Cnclss 9 DSB Design Build 5,6 Any With Conclass 9 only ENV Environmental C Any INC Contract Incentives 5 A LAR Local Advance Reimburse A 8 With Program 39 only MNT Brdg/Rdwy/Contract Maint 7 Any Excl Phase 76 and 77 OPS Operations 8 Any PDE P D & E 2 Any PE Preliminary Engineering 3 Any Excl Phase 36 and 37 PLN Planning 1 Any RES Research B Any RPY Repayments 5 D Also incl Ph A8 w/pgm 61,78,SB ROW Right of Way 4 Any Excl Phase 46 and 47 RRU Railroad & Utilities Any 6,7 Excl Phase Group 1 and 2 MSC Miscellaneous Other Other
Component Descriptions Trans Phase Phase Budget Component Description System Group Type Dist Highways 01,03-07,16 Any Any Any Turnpike 02 Any Any Any Fixed Capital Outlay 12 Any Any Any Research & Testing Any B Any Any Transportation Planning 13 1 Any Any Maintenance Any 7 Any Any F, L and PO 08-11,15 Any Any Any Transportation Disadvantaged 14 Any Any Any Florida Rail Enterprise Any any Any 31 Miscellaneous Any Other Other Other Any
System Group Descriptions Trans System Group System Program Exceptions Interstate 01 Any Excl pgm 90 State Highways 03,04,05 Any Excl pgm 90 Local Roads 06,07 Any Excl pgm 90 Intermodal 08-11,15 Any Excl pgm 90 High Speed Rail Development Any 90 Other Any Other Other Excl pgm 90