DPP Update Generator Interconnection Studies IPTF September 7 th, 2016
Outline East Area DPP summary DPP-2015-FEB-ATC DPP-2015-FEB-MI DPP-2015-AUG-MI Central Area DPP summary DPP-2015-FEB & 2015 AUG-Central DPP-2016-FEB-Central DPP-2016-AUG-Central West Area DPP summary DPP-2015-FEB-West DPP-2015-AUG-West DPP-2016-FEB-West DPP-2016-AUG-West South Area DPP summary DPP-2015-FEB-South DPP-2015-AUG-South DPP-2016-FEB-South DPP-2016-AUG-South 2
DPP East Area Summary
2015 February Michigan County J301 Tuscola ITCT 101 Wind J308 Sanilac ITCT 301 Wind J321 Sanilac ITCT 151.2 Wind J392 Otsego METC 383.1 Gas J406 Wexford METC 4 Wood J408* Sanilac ITCT 200 Wind J419 Washtenaw ITCT 100 Solar J421* Monroe ITCT 32 Nuclear J422* St. Clair ITCT 30 Gas J423* Wayne ITCT 125 Gas J424* Wayne ITCT 120 Gas *Withdrawn Total : 1547 MW Complete 4
2015 August Michigan County G934 Gratiot METC 150 Wind J264 Shiawassee METC 120 Wind J440 Wayne ITCT 80 Gas J452* Sanilac ITCT 150 Wind J466 Huron ITCT 30 Co-Gen J469 Crawford ITCT 1.8 Wood *Withdrawn Total : 382 MW Study kicked off 8/4/2016 Model Review Complete 5
2015 February ATC County J384 Dane ATC 21 Gas J390 Rock ATC 702 Gas J394 Marquette ATC 280 Gas J395 Lafayette ATC 98 Wind Total : 1101 MW System Impact Study Complete Network Upgrade Facility Studies In-Progress 6
2016 FEB AUG ATC County J505 Manitowoc ATC 100 Solar J592 Delta ATC 48.3 Wind J606 Monroe ATC 150 Wind J652 Lafayette ATC 98 Wind Total : 396.3 MW Estimated Kickoff September 2016 7
DPP Central Area Summary
DPP 2015 February & 2015 August Central J375 AMRN ERIS 124 Wind J401 IPL +20/-21 Battery J431 NIPS Only 100 Wind Total : 244 MW J291 AMRN 42 Gas All Studies Complete. GIA negotiations Complete. J453 CIN ERIS 17.25 Solar Total : 59.25 MW 9
DPP 2016 February Central Study kicked off: Aug. 15, 2016 J351 NIPSCO 705 Gas J468 AMRN 202 Wind J515 DEI ERIS 400 Wind Total : 1307 MW 10
DPP 2016 August - Central J446 J456 J474 J476 DEI AMRN AMRN MEC 200 150 144 246 Wind Wind Wind Wind J513 J541 J573 J595 J598 J611 J641 J642 NIPSCO ATCI AMMO DEI ATCI MEC AMRN DEI 100.5 400 40 150 300 110 140 175 Wind Wind Solar Wind Wind Wind Solar Solar J643 J644 J648 NIPSCO AMRN CE External 175 110 37 Solar Solar Gas J649 METED External 805 Nuclear Pending DPP-2016-FEB Completion 11
DPP West Area Summary
DPP 2015 February - West G736 OTP ERIS 200 Wind J299 XEL (NSP) ERIS 73 Gas J385 XEL (NSP) 100 Solar J391 MRES 50 Gas J400 XEL (NSP) 62.5 Solar J405 MDUM 40 Gas J407 ITCM 200 Wind J411 MEC 300 Wind J416 ITCM 200 Wind J426 XEL (NSP) 100 Wind Total : 1475.5 MW Complete Final Report Posted 13
DPP 2015 August - West J041 ITCM 90 Wind J298 ITCM 300.9 Wind J330 Xcel 24.75 Solar J399 Xcel 214 () Gas J412 MEC 200 Wind J436 OTP ERIS 150 Wind J437 OTP ERIS 150 Wind J438 ITCM 170.2 Wind J442 OTP 200 Wind J443 ITCM only 41 Wind J449 ITCM 202 Wind J454 MRES only 18.9 Wind J455 MEC ERIS 300 Wind Study Kickoff: 6/14/2016 Analysis Underway Est. Completion : October 2016 Total : 2061.75 MW 14
DPP 2016 February - West J432 Xcel 98 Wind J460 GRE 200 Wind J475 MEC 200 Wind J485 RPUM 46.85 Gas J488 MDUM ERIS 151.8 Wind J489 MDUM ERIS 151.8 Wind J490 MDUM 60 Wind J493 OTP 150 Wind J495 ITCM NIRS 200 Wind J497 ITCM 170 Wind J498 MEC 340 Wind J499 MEC 340 Wind J500 MEC 500 Wind Pending DPP-2015-AUG Completion 15
DPP 2016 February - West J501 MEC 500 Wind J504 ITCM 50 Solar J506 MEC 200 Wind J510 OTP 326.9 (Winter) Gas J514 ITCM 65 (Winter) Gas J531 Xcel 200 Wind J534 MEC 250 Wind J535 MEC 210 Wind Total: 5860.35 MW J523 ITCM 50 Solar J524 MEC 100 Solar J525 Xcel 50 Solar J526 OTP 300 Wind J527 MEC 250 Wind J528 MEC 200 Wind J529 MEC 250 Wind J530 MEC 250 Wind Pending DPP-2015-AUG Completion 16
DPP 2016 August - West J302 MDUM 101 Wind J414 ITCM 200 Wind J439 MEC 500 Wind J457 MDUM 150 Wind J459 OTP 200 Wind J503 MDUM 100 Wind J511 GRE 200 Wind J512 XEL 250 Wind J555 MEC 200 Wind J562 MEC Only 119.6 Wind J563 MEC Only 150 Wind J569 XEL 100 Wind J575 XEL 100 Wind Pending DPP-2016-FEB Completion 17
DPP 2016 August - West J577 XEL 102.8 Wind J583 MEC 200.1 Wind J587 XEL 200 Wind J590 MEC 90 Wind J637 OTP 98 Wind J638 OTP 204 Wind J650 OTP 151.8 Wind J651 OTP 151.8 Wind J593 MDUM 250 Wind J594 ITCM 300 Wind J596 GRE 100 Wind J597 OTP 300 Wind J599 MDUM 200 Wind J607 MDUM 200 Wind J613 OTP 100 Wind J614 ITCM 66 Wind J615 ITCM 70 Wind Total: 5155.1 MW Pending DPP-2016-FEB Completion 18
DPP South Area Summary
DPP 2015 February - South Number MW J319 Entergy 500 HVDC J319 J417 Withdrawn Entergy 43 Waste Recovery / Steam SIS Draft SIS report 6/30/16 Comments under discussion J417 FAS study report posted 6/1/2016 SSTI / SSR / HIS draft study report 7/19/2016 20
DPP 2015 August - South Number MW J396 Entergy 904 CC(2), GT(1) J429 Entergy 100 Wind Turbine J465 Withdrawn Cleco 44.1 Waste recovery Final DPP SIS report posted on 5/5/2016 https://www.misoenergy.org/_layouts//ecm/redirect.aspx?id=224051 FAS1 studies - completed FAS2 studies - ongoing J429 J396 J465 21
DPP 2016 February - South DPP 2016 February south SIS & FAS study kicked off 7/19/16 DPP SIS models posted for review - 8/23/16 Number MW J473* SMEPA ERIS 52 Solar J473 J482 Entergy 19.8 CC Gas J486 Entergy Only 51.5 Combined Cycle J486 J518 J518 Entergy 49.5 Solar J482 * Note: GIA has been executed for J473; whose POI is remote with respect to other projects in DPP 2016 February south. Final DPP SIS report posted on 2/12/2016 https://www.misoenergy.org/planning/generatorinterconnection/pages/activestudyreportsandp olicystatements.asp 22
DPP 2016 August - South DPP 2016 August south SIS & FAS study kick off 10/3/16 DPP SIS models targeted to be posted for review by 10/15/2016 Number J472 Entergy MW 923.8 Gas /CC J477 Entergy 31.9 Gas J481 Entergy 241 Gas /CC J483 Entergy 99.96 Solar J484 Entergy 933.8 Gas J516 Entergy 150 Solar J544 Entergy 98.1 Solar J552 Entergy 100 Solar J472 J482 J603 J588 J620 J586 J622 J552 J544 J581 J604 J477 J553 J634 J559 J484 J516 J481 23
DPP 2016 August - South Number MW J553 Entergy 50 Solar J559 Entergy 50 Solar J581 Entergy 80 Solar J586 Entergy 175 Solar J588 Entergy 100 Solar J603 Entergy 99.96 Solar J604 Entergy 99.96 Solar J619 Entergy 50 Solar J620 Entergy 100 Solar J622 Entergy 100 Solar J634 Entergy 100 Solar 24
Contacts Chad Craven DPP West Area Contact ccraven@misoenergy.org 651.632.8478 Swaraj Jammalamadaka DPP West Area Contact sjammalamadaka@misoenergy.org 651.632.8458 Meera Shukla DPP South Area Contact mshukla@misoenergy.org 504.846.7111 Shane O Brien DPP East Area Contact sobrien@misoenergy.org 651.632.8453 Weiqing Jiang DPP Central Area Contact wjiang@misoenergy.org 317.249.5453 25