Meeting Notes: Project team gave a presentation to provide background; available at

Similar documents
721 N. MAIN CONCEPTUAL SITE PLAN DEVELOPMENT CITY WIDE MEETING #2 MEETING SUMMARY

DOG OFF-LEASH AREA WELCOME TO OPEN HOUSE #2 QUEENSBOROUGH DOG OFF-LEASH AREA RELOCATION

Valley of the Moon Park Site Plan Update Advisory Group Meeting #1 March 18, 2014 Spenard Recreation Center

Proposed New Brighton Park Shoreline Habitat Restoration Project

CIVICS DIRECTOR S NOTES MARCH 19, MONTHLY BOARD MEETING

Proposal for Dog Park at Virginia Avenue Park

Moorhead, Minnesota. Photo Credit: FEMA, Evaluating Losses Avoided Through Acquisition: Moorhead, MN

Dog Off Leash Strategy

COUNTY OF ALBEMARLE STAFF REPORT SUMMARY

People, Parks & Dogs: A strategy for sharing Vancouver s parks Round 2 Public and Stakeholder Consultation: January 30 March 10, 2017

Housing on the Fountainbridge site

EAGLE RIVER/CHUGIAK PARKS & RECREATION DEPARTMENT

Report to the Raleigh Parks, Recreation and Greenway Advisory Board: Off-leash Dog Areas. Background

Coffey Neighborhood Park

Public Engagement January 14-15, 2015

Humber Bay Park Project Survey Online Summary of Findings Report

Action Requested ACTION STEPS:

DRAFT PUBLIC SPACES MASTER PLAN. POPS Advisory Committee October 30, 2017

Consideration Report. Proposed New Brighton Park Shoreline Habitat Restoration Project PURPOSE

Planning and Zoning Staff Report for Grant Settle Conditonal Use Permit - PH2018-8

North. Patrick J. Meli Park. Keeyahna Sheard URP 4870 Fall 2007

A member stated that we don t want to take away small business owners and family heads who need to park their business trucks overnight.

Agenda Item No.: Date: January 26, 2010

OUTCOME OF DOG EXERCISE AREA TRIAL AT CIVIC AVENUE RESERVE, KOGARAH

Planning and Zoning Staff Report for Ekard Conditonal Use Permit CU

STRATHCONA COUNTY. Dog Off Leash Strategy

Parley s Historic Nature Park Management Plan

2014 Albany Residents Community Survey

5 September 10, 2014 Public Hearing APPLICANT:

OUTAGAMIE COUNTY REQUEST FOR QUALIFICATIONS / PROPOSAL FOR PARK PLANNING AND PRE DESIGN SERVICES DUE BY: MARCH 12, 2018

Project Timeline

DOGS IN OPEN SPACES STRATEGY:

4MRVWG Dog Park Committee

Sparwood Off-Leash Dog Park

ANN ARBOR DOWNTOWN DEVELOPMENT AUTHORITY MEETING MINUTES Wednesday, February 2, 2011 DDA Offices, 150 S. Fifth Avenue, Ann Arbor, MI 48104

SOSSAMAN CLOUD PARK. Site Conditions

In advance or after the event, write to with your questions and comments.

Student Booklet. Grade 4. Georgia. Narrative Task: Animal Adventure Stories. Copyright 2014 by Write Score LLC

NOTICE OF DECISION BEFORE THE SKAGIT COUNTY HEARING EXAMINER. c/o Bruce Lisser P. O. Box 1109 Mount Vernon, WA 98273

St. Clair Reservoir Rehabilitation: Proposed Changes to Sir Winston Churchill Park Dogs Off-Leash Area and Tennis Courts

27% 79K CAYUGA COUNTY, NY: PROFILE COMMUNITY CHARACTERISTICS

CLEAR LAKE CITY WATER AUTHORITY GREEN SPACE PLANNING COMMITTEE. Dog Park Sub-Committee August 30, 2012

EGULAR MEETING OF THE PLANNING COMMISSION Dearborn, Michigan. March 07, 2016

1 October 2014 Public Planning Workshop Report for the Story Mill Community Park Bozeman, Montana

Village of Put-in-Bay Planning Commission P.O. Box 481, 435 Catawba Ave., Put-in-Bay, Ohio Ph:

Off-leash Dog Beaches & Parks Community Engagement Report. September 2016

About GOTBA Vic. Yours sincerely. The Executive Committee. Greyhound Owners, Trainers and Breeders Association of Victoria Inc.

Anchorage Parks and Recreation Dog Park Site Suitability Study: Abbott Loop Community

/?fref=ts Website

REPORT TO PLANNING COMMISSION City of Sacramento

Plainville Dog Park. Proposal and Information

Background, Key Issues, SLC Policies, Existing Parks, National Comparison. Voice & Tag Program, Fee Program, Limited Hours, Volunteer Roles

Staff Report. Donna Silva, Parks & Community Services Director. Recommended CEQA procedure for location of dog park at core area pond

COMMUNITY PARK AUDIT TOOL

Off-Leash Dog Park/Area Project Proposal

245 responses. Summary. Trail for walking/jogging. Trail upgraded for bicycling/rollerblading. Canoe and Kayak launch.

Auburn Dog Park Committee

Litter Education Theme 1: Defining

Service Dog Application Form

The requested zoning amendment is to allow for day sitting of dogs and domestic cats as a Home Occupation.

Applicability of Earn Value Management in Sri Lankan Construction Projects

Track & Search Dog Information for Judges

AVMA 2015 Report on the Market for Veterinarians

City of Port Moody Minutes

BEVERLY HILLS STAFF REPORT. Meeting Date: August 4, 2015 To: From: Subject:

We understand that your time is a precious, limited resource and we appreciate that you spend some of it helping us.

WELCOME. 1 st OAKMONT DOG PARK TOWN HALL APRIL 19, /20/2018

UPDATE: Dog Off Leash Areas July 7, 2011

Outcomes of the Hazelmere Reserve Community Survey

CITY COUNCIL AGENDA REPORT FROM: JEFF RUBIN, DIRECTOR OF COMMUNITY SERVICES DISCUSSION AND RECOMMENDATION ON THE WILD WALNUT PARK MASTER PLAN

Goodhue County Land Use Management

6. SPAY/NEUTER: FINANCIAL ASSISTANCE PROGRAMS FOR PET CARETAKERS LIVING IN POVERTY-- WE CAN T GET TO ZERO WITHOUT THEM

Alcona Humane Society Strategic Plan

Applying PZP Vaccines in the Field:

MINUTES OF THE REGULAR MEETING WORTHINGTON ARCHITECTURAL REVIEW BOARD WORTHINGTON MUNICIPAL PLANNING COMMISSION October 11, 2018

Franck Berthe Head of Animal Health and Welfare Unit (AHAW)

BOOK 4. The python problem. The. problem $4.99 ISBN >

Meeting Minutes New Prague Park Board Tuesday, March 13, :30 PM

Pioneer Dairy Wetlands

Upcoming ASPCApro Webinars

The Emergency Shelter Learning Series. Low-Barrier Access to Shelters for People and Their Animals

Francis City Planning Commission Meeting Thursday May 5, 2016

UNDER AGREEMENT REX HOSPITAL WAKEFIELD COMMONS & CROSSING RALEIGH, NORTH CAROLINA LAND FOR SALE ±32.95 ACRES

Urban Chickens P U B L I C P A R T I C I P A T I O N R E P O R T

COMMUNITY SURVEY #1. Survey Overview. Survey Results

Cache Community Dog Park Logan, Cache County, Utah A Proposal to Develop an Off-Leash Dog Park in Cache Valley By the Cache Humane Society

STAFF MEMO July 18, 2017 Council Work Session

Summary of results 211 respondents. Survey was held open 53 days. Survey link was posted on CC Listserv, noted in NW Current, and noted in Lafayette

Dog Parks. Every dog deserves a great day at the park!

Cheltenham Mall and Upper Rock Creek Litter and Creek Trash Photo Survey

1.0 SUMMARY OF THE ACTIVITY UNDERTAKEN TO PROTECT AND ENHANCE THE ENVIRONMENT: PROJECT OBJECTIVES, SOLUTIONS AND ACHIEVEMENTS

The courses are divided into sections or exercises: Pen or sheepfold Difficult passages Handling and maneuvering Stopping the flock

PROCEEDINGS OF THE ST. CLOUD PLANNING COMMISSION. A meeting of the St. Cloud Planning Commission was held on April 14, 2009, at 7 p.m.

Intervention Plan. By: Olivia Bergstrom, Lia Donato, Ashley Hasler, Steve McCollom, and Ashley Staley

Raley Field diversifies with nonbaseball events, upgrades with surrounding projects

Proposals for the Urban Development Project in the Area of Shibuya Station and its Surroundings

TOWN OF JUPITER. Honorable Mayor and Members of Town Council Lori Bonino, Interim Town Manager

Let s Talk Turkey Selection Let s Talk Turkey Expository Thinking Guide Color-Coded Expository Thinking Guide and Summary

Identification Water Feed Evacuation PREPAREDNESS GUIDE

Nichols Hills E-News. CITY COUNCIL Business Is Picking Up!! Oops, I mean, Pick Up Your Business!

Transcription:

721 N. MAIN CONCEPTUAL SITE PLAN DEVELOPMENT CITY WIDE MEETING #1 MEETING SUMMARY Date: Time: 6:30 8:30 pm Location: Ann Arbor Community Center, 624 N. Main Street Attendees: Public Present: 54 ; refer to Appendix A for sign in sheet City staff present: 7; Sumedh Bahl; Kayla Coleman; Jerry Hancock; Matt Naud; Connie Pulcipher; Wendy Rampson; Colin Smith Consultant Team present (SmithGroupJJR): 2; Neal Billetdeaux; Oliver Kiley Re: City Wide Meeting #1 Meeting Notes: Project team gave a presentation to provide background; available at www.a2gov.org/721nmain. Opportunities and Constraints Analysis Key point is that site access is visually and physically very limited Floodway/ floodplain: limited opportunities for stormwater infiltration because the water table is very close to the surface at this location. Day lighting Allen creek is not a recommended option for this site because of the high volume of water, also because of water quality concerns. Easement around Allen creek drain (underground pipe) needs to stay clear of significant structures. Phase 1 Environmental Assessment for 721 N Main has been completed. The report is in draft form and is being reviewed by city staff. The city has met with Reverend Whiten of the Ann Arbor Community Center; she is excited about the project and wants to be engaged. 721 N Main is zoned as public land (PL zoning) but that is not a limitation; it can be rezoned. Scenarios Some examples of what could possibly happen with the site were presented. The scenarios are not proposed alternatives; scenarios are intended to provide broad examples and stimulate thought. The scenarios show increasing levels of development intensity. Open Discussion Notes: (Note: this is not a direct transcription of the meeting discussion. This summary has been developed from notes taken during the meeting; comments are paraphrased. Where staff responses or clarification were provided they are shown in italics) When is the project expected to be implemented? Staff response: That is not yet determined; it will be based on available funding. The City cannot yet say when the plan may become a reality. Will the environmental impact decide which option we pursue? Staff response: The recommended option will determine how much clean up is needed. The plan drives the clean up. Concern that that city is not using the current floodway mapping. Staff response: The project team is using the latest Federal Emergency Management Agency (FEMA) Flood Insurance Rate Maps (FIRM) issued on April 03, 2012. There are many parks close to the 721 N Main site, but it is important to look at uses of the parks to balance potential for the site with needs. Page 1 of 8

Technical Committee are they analyzing pipes, underground flow, etc? The size of the pipes, state of pipes, pipe capacity?; Staff response: Current pipes can handle 1 ½ yr flood. Can build a bigger pipe but it is very expensive and there will always be a bigger storm. Pioneer High School crew team at Bandemer Park, heavy pedestrian traffic. Support that the FEMA maps are correct, local neighbor has done investigation, not able to get out of paying flood insurance. There is an existing dog park nearby. Clarification Ann Arbor Parks & Recreation Services provides two dog play areas in city parks; Swift Run Park at the City s south end (Ellsworth Rd and Platt Rd) and Olson Park at the far north end (Dhu Varren Rd). The City of Ann Arbor does not currently provide any centrally located dog parks. If feasible to poke hole in railroad berm it may shrink the floodplain; Staff response: A feasibility study is being conducted. Will also research feasibility of a pedestrian crossing. Crossing railroad tracks support for bridges financed with Tax Increment Financing (TIF) funds. Local neighbor pointed out that 721 N Main doesn t have great pedestrian access. Needs a unique use to attract people through the site. Meaning of the term engage adjacent property owners in presentation?; Staff response: how does it affect you? Making sure we look at the surrounding neighborhood and not at the site in a vacuum. Support for dog park. Site needs to be looked at in the larger context of N Main. Does not support tax financing. Would not like to see high rises in this area. Need to take time with decision on this property interim/ temporary uses. Why rush to make decision on 721 N Main? Let s wait until we have a North Main Corridor plan; Staff response: Clarification We need to determine the best use for the open space component of the site; how to use that space and not preclude future uses in the area outside the floodway Interest was expressed in public meetings for the entire N Main Corridor. The North Main Vision Task force (NMVTF) commented that they will hold public meeting(s) for the broader area. There will be opportunities for public input on N Main Corridor. Note all task force meetings are public and there is opportunity for public comment. Has the AARR been engaged?; Staff response: We will reach out to them as a stakeholder. Context and Neighborhood are keywords in the discussion of plans for 721 N Main Need to think creatively when talking about options for the site. Work with neighbors, e.g. easements; look for mutually beneficial outcomes. Need to think outside the boundaries. Grant funds may provide opportunities. Support the greenway Concern about how the greenway is being represented Need to keep options open for greenway Very close to downtown, increasing density. Great area for a park. Staff input: Schedule set up for application to MDNR Trust Fund, due April 2013. MDNR application requires a proposal and cost estimate. Not just I want to build a park ; it needs to Page 2 of 8

be more specific. Largest grant amount is $300,000. Can apply without matching funds but it is scored against you. Need matching funds to be successful. MDNR grant could focus on just a portion of the site e.g. just the floodway; we do not have to define what will happen on the nonfloodway portion of the site. Staff input: FEMA grant to remove buildings in the floodway It looks like the grant will be awarded in December, 2012. Grant ~$100,000, we estimate that it will cost ~$130,000 to take down buildings. Other grant opportunities may exist. Don t see a need to wait on 721. All proposed/ potential options look favorable. The question we need to ask ourselves is: What problem are we going to fix by developing this property. How will our quality of life be better when this project is done? What added benefit will this bring? Walk by space minimum of 2x/ day need to consider utilization of CNG fueling station very underutilized. I rarely see anyone there. It is a risk to the neighborhood; we hear the traffic and smell the fumes we don t need that risk! Belize park over represented on the graphics shown during 721 N Main presentation, it is actually much smaller area that what is shown on the map. Staff response: point taken; the graphic is just a diagram, however, we will make the circle on the graphic smaller. PROs (Parks & Recreation Open Space Plan) plan considerations are very important. This area was not considered underserved for parks in recent evaluations. Connectivity is important. Is it a high quality natural area? No. Support for some development because of safety reasons. Opposed to medium or high density development in the area Concerns about traffic in the area, increasing congestion Development downtown is increasing there is a need for parks. Water Hill is defined as the area between Miller, Main St., Sunset, and Brooks streets Office space may not create more eyes (on the park) people are only there during the day. Support for residential development Support for large park Other cities e.g. NY, Kalamazoo are generating great funds from their Greenways. e.g. festivals. Need for large open space near downtown. A lot of opportunity to do better in N Main Corridor. Parking lot right on Main St doesn t seem to be the best use of that space. Perhaps some agreement could be made with the Community Center; Staff Response: This may be an option, will be a continued conversation with the Ann Arbor Community Center. Comments from Written Feedback Forms: (Note: all comments from an individual respondent remain grouped together; i.e. each number represents a respondent and all written comments as they were submitted) 1. With density in downtown and near downtown living the size of this parcel offers such opportunity for growing space and mixed use living and working designs. Page 3 of 8

Community gardens Multipurpose civic facilities 2. A community gathering space would be preferable, with a bike/ pedestrian path through. Folks suggested a dog park, flea market, concert/ arts space the steep slopes would be well suited to seating. What about transport depot for light rail, or circulations downtown bus between parks, downtown, parking, hospital. Consider selling few feet of land to the adjoining neighbors to create a buffer. 3. Good meeting 4. Adjacent zoning needs to be analyzed for possible changes needed (not necessarily or just the PL) Recreation + Public Use section: Very important to integrate enhancements with existing character Natural/ cultural interpretation: a balance likely most successful. Residential focus: except on the existing to integrate in with positive impact 5. Floodplain/way is not reliable for planning for this site. Spicer who drew images indicated this in writing as well as verbally. Festival and connection to AC Greenway would be a great improvement and economic and environmental gain. Festival use with income potential Improve quality of life, recreation 6. Is there any possible connection over railroad through easement on Triangle Towing site or adjacent properties? For special programming/ civic facilities I am especially interested in the possibility of having some sort of performance stage venue or shared art space. Would be perfect for Water Hill Music Fest. If development occurs residential focus would be preferred, but NOT high rises. 7. Art 8. I really like the ideas that Lou G. mentioned festivals, fairs, flea markets. The older brick building is aesthetically interesting and those ideas could be tried there. I realize that daylighting Allen Creek has been ruled out but I am not convinced! Thanks for the good work! 9. Integrate with N. Main Corridor development plans. Slide 721 toward the river with walkways OVER N Main, OVER Depot. 10. Great opportunity make good use of it for the good of all 11. Dog Park, bike access to North Corridor Too much industry in area already (e.g. Beal) 12. It would have been nice to meet Rail company reps and Community Center reps to hear their perspective. Feels sneaky not to include them from the beginning of the process. Preferences section This is a terrible way to ask this question, VERY confusing 13. Max open space and connection to Conceptual Greenway and Argo 14. Prefer mixed use with majority open space. Access (drive ways, paths) will be critical in virtually all of resulting projects. If it is not integrated well within the streetscape, it will not be used. 15. Do we really need another park for drunks and bums (been to wheeler lately?) Page 4 of 8

16. Prefer open space/ ecological/ flood management and connection to greenways. No TIF no dense development. 17. My preference would be flex space permanent. This would accommodate Greenway and temp space for events and flea markets. 18. High rise development is not needed, this is a vibrant residential neighborhood NOT downtown. We don t want downtown development. Water Hill lives. I want park space I prefer natural Residential 1 to 2 story I think current needs for both residential/ office and park land do not take into account current development of multiple high rises and offer development downtown and the proposed development across the street on N Main. A park is needed, water quality treatment is needed, Greenway/ parking is needed. 19. Wasn t discussed. What if Mich Con area becomes a park? Agree best ideas were dog park area and spaced programs/ civic use for example Water Hill Music Fest events. Why not 3 5 venues along the tracks. Why not a monthly flea market/ craft shows. Move the natural gas pump! This is no longer an industrial area! 20. Dog park would be valuable to neighborhood and greater Ann Arbor area. Enhancement of water quality and flow is very important. Enhancement of ecology would improve water quality for water entering Huron River. Removal of natural gas refueling pump is vitally important. Arts center in refurbished existing building would benefit Ann Arbor Please report written comments. 21. Thank you for allowing open questions and dialogue. The format was much better than previous public meeting during which comments were submitted on cards and responded to without dialogue. Open space enhances character and attractiveness. Dog park is ok, public availability for picnics, events, gatherings, performances. Maximize habitat creation to support water management I prefer maximum green. Rehabilitate to existing wetlands. Let this be a place for people who live in the area and want to use the open space. I agree that safety can be an issue, remember that there are lots of parks with poor sight lines and we use them! 22. Looks like the Community Center and City could have a very good mutually beneficial entrance and parking. Dog park along RR where already have fence. Show Greenway through the floodway (not right next to RR) great opportunity to have bike boulevard So much of this Floodway and fringe flood should obviously be park/ trail/ dog park/ recreation use. Central area needs to be able to see open space really need a bigger main street entrance. Page 5 of 8

23. The Ann Arbor Rail Road has begun to remove a feeder track from their main track at Summit down to Felch St. At present it is in a mess of scattered ties and rails and spikes and weeds. This spur line follows the fence line all the way to Felch st on the western border. Working closely with the railroad will be important to greatly improve the site. Homeless people and children often walk down this track as a shortcut. It could pose a problem. I believe that the gas station on the corner must be removed and relocated. This would also improve the access to the site from the gate on Summit which is better than the driveway off Felch. Page 6 of 8

Common Themes (sorted by number of references for suggested use/ topic): Written Feedback Forms* Open Discussion Notes** Suggested use/ Keywords Total count topic # references Representative Quote # references Representative Quote Positive neutral negative Positive neutral negative Positive neutral negative Max open space and connection Greenway; bike/ Greenway, Bike, Need to keep options open 11 2 to Conceptual Greenway and 3 1 14 3 pedestrian path Pedestrian, Walk for greenway Argo Civic Facilities/ flex space Civic, Flex, Fair, Festival, Concert, Music, Perform Dog Park Dog Park 6 Residential Development Water Quality Residential 3 2 1 Water Quality, Stormwater, Management 8 4 For special programming/ civic facilities I am especially interested in the possibility of having some sort of performance stage venue or shared art space. Would be perfect for Water Hill Music Fest. Dog park would be valuable to neighborhood and greater Ann Arbor area If development occurs, residential focus would be preferred, but NOT high rises 1 Other cities e.g. NY, Kalamazoo are generating great funds from their Greenways. E.g. festivals. 1 1 Support for dog park 7 1 1 Support for residential development Enhancement of water quality and flow is very important. No representative quotes 4 9 4 2 1 * One reference per respondent is tallied (A single respondent that cited the keyword(s) multiple times is tabulated as 1 reference). ** One reference is tallied for each time given keyword(s) is cited (Because comments were not attributed to a particular respondent during the open discussion, we cannot limit tallies to one per respondent on a topic); Open Discussion quotes are not direct transcriptions.

APPENDIX A SIGN IN SHEET Page 8 of 8