Final Report of Civil Engineering and Environmental Survey 2014

Similar documents
Cause Analysis of Asphalt Pavement Rutting on Section N5 in Pakistan

Wattle Application on Linear Projects

St. Clair Reservoir Rehabilitation: Proposed Changes to Sir Winston Churchill Park Dogs Off-Leash Area and Tennis Courts

5 September 10, 2014 Public Hearing APPLICANT:

Planning and management checklists: a review tool for producers

Versatile Coir Wattles Offer Cost-Effective Sediment Control at Construction Sites

Litter Is Waste Out of Place

Rutting Performance Of Hot Mix Asphalt (HMA) during 60 degree temperature

Rutting: Causes, Prevention, and Repairs

United States Department of Agriculture Animal and Plant Health Inspection Service. Inspection Report. Customer ID:

On the Trail to Health, Heritage, and Happiness Route 4: Greeley s Number Three

Lockwood Folly Property Owners Association Board of Directors Meeting February 14 th, 2019

Kansas Department of Transportation DISTRICT 6. Project(s): Max: Min:

F7 RODENT AND PEST CONTROL

Litter Topic: A week of lesson plans (cross curricular)

HAT HILL DOG OFF-LEASH AREA MODIFICATIONS

Nichols Hills E-News. CITY COUNCIL Business Is Picking Up!! Oops, I mean, Pick Up Your Business!

Nest Site Creation and Maintenance as an Effective Tool in Species Recovery

COMMUNITY PARK AUDIT TOOL

Snapping Turtle Monitoring Program Guide

Best Practice on the Farm

A copy of the completed checklist must be provided to both the permit holder and the municipality, per 20 V.S.A. 3682(d). Species/Breed: Name: Title:

GREATER SAGE-GROUSE BROOD-REARING HABITAT MANIPULATION IN MOUNTAIN BIG SAGEBRUSH, USE OF TREATMENTS, AND REPRODUCTIVE ECOLOGY ON PARKER MOUNTAIN, UTAH

CONCLUSIONS AND SUGGESTIONS AFTER EEP-VCF STAFF VISIT AT THE POZNAN ZOO

2014 WASTE PROPOSAL. Charlie Hamilton

Ernst Rupp and Esteban Garrido Grupo Jaragua El Vergel #33, Santo Domingo Dominican Republic

STUDENT MANUAL CANINE SEARCH SPECIALIST TRAINING UNIT 8: ADVANCED RUBBLE SEARCH

Cheltenham Mall and Upper Rock Creek Litter and Creek Trash Photo Survey

PEREGRINE FALCON HABITAT MANAGEMENT GUIDELINES ONTARIO MINISTRY OF NATURAL RESOURCES

PALFINGER on the tracks

Moorhead, Minnesota. Photo Credit: FEMA, Evaluating Losses Avoided Through Acquisition: Moorhead, MN

Meet the Larvae BROWARD COUNTY ELEMENTARY SCIENCE BENCHMARK PLAN. SC.F The student knows the basic needs of all living things FOR PERSONAL USE

ANNEXES. to the Proposal. for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

On-Farm Salmonella Control Measures For. Pest Control

Cayuga County Water Quality Management Agency

Design Guide. You can relax with a INSTALLATION QUALITY,CERTIFIED QTANK POLY RAINWATER TANKS. qtank.com.au

ALL ABOUT: FOAM SEDIMENT CONTROL WATTLES

SECTION IV-1 PARLOURS

This Bucket Means Business

Collection. Die-Cast Scale Model Replicas

People, Parks & Dogs: A strategy for sharing Vancouver s parks Round 2 Public and Stakeholder Consultation: January 30 March 10, 2017

Disappearing Marine Iguanas: A Case of Population Collapse

Community Cats. Tips to keep your Community Cats away from your property. Adopted from Neighborhood Cats TNR Handbook 2 nd Edition

Kansas Department of Transportation DISTRICT 1. Project(s): 081 U / TA-U230(601) Max: Min:

SUBJECT: Standards for the registration of a veterinary approved dipping station. Registration of a veterinary approved dipping station.

ATTACHMENT NO. 35 ENDANGERED SPECIES PROTECTION PLAN

Parley s Historic Nature Park Management Plan

FRENZ. World Leading Poultry Layer Standard

Hope in the making. Belayneh Akalu March 08, 2013

Multiple broods from a hole in the wall: breeding Red-and-yellow Barbets Trachyphonus erythrocephalus in southeast Sudan

ALL ABOUT: FOAM SEDIMENT CONTROL WATTLES

Disappearing Marine Iguanas: A Case of Population Collapse

Type of route - linear Distance 11 Km. By bike: Duration 1h05m Difficulty rate easy. On foot Duration 3h30m Difficulty rate - moderate

San Mateo County Environmental Health

UK HOUSE MARTIN SURVEY 2015

Technical Assistance for Homeowners

GENERAL PREVENTION PRACTICES CHECKLIST FOR BEEF AND DAIRY PRODUCERS

PROTECTION OF THE GREAT CRESTED NEWT

Key concepts of Article 7(4): Version 2008

Kansas Department of Transportation DISTRICT C / SRTS-C030(802) Project(s): Min: Max:

9. Creating Reptile Habitat Features

PARK RULES FOR WOLDS RETREAT. In these rules:

GENERAL PREVENTION PRACTICES CHECKLIST FOR SHEEP AND GOAT PRODUCERS

Nye County Animal Control

Amrun Project Feral Animal Monitoring Annual Report August 2017

Human Impact on Sea Turtle Nesting Patterns

BEVERLY HILLS STAFF REPORT. Meeting Date: August 4, 2015 To: From: Subject:

Document Information. Quality Assurance Register. Auckland Transport. NZ1700 Auckland PT Development Plan

10/11/2010. Kevin Enge

IMPLEMENTATION GUIDE considerations for delivery

Parameter: Productivity (black-legged and red-legged kittiwakes); populations (marine mammals)

CONTROL TICKS THAT MAY CARRY LYME DISEASE

4MRVWG Dog Park Committee

General Prevention Practices for Beef and dairy Producers

Mr T.B Brown. Land off Turweston Road, Northamptonshire REPTILE SURVEY REPORT

An Evaluation of Environmental Windows on Dredging Projects in Florida, USA

Marine Turtle Monitoring & Tagging Program Caño Palma Biological Station Playa Norte Morning Protocol 2013

A GUIDE TO BUILDING FERAL CAT SHELTERS. brought to you by

Yellowjacket Habitat at Home

WOOLSHED PARK COMMUNITY FEEDBACK SUMMARY

INVASIVE MOSQUITO SPECIES ALERT Aedes aegypti

DEVELOPMENT OF A DAIRY SHEEP RESEARCH FACILITY

Turtle Mitigation for Road and Highway Projects Pembroke District MNR Interim Guidelines Version 1.0 (April 2014)

Natural Gas.

The rutting situation on the asphalt pavements of Vietnam

SUMMER PESTS. Information about the pests that could pose the greatest threat to your restaurant this season.

STRATHCONA COUNTY. Dog Off Leash Strategy

Kingpin to rear end 10.1 m (33' 2") Mass on Tandem Allowable Load on Axle Standard: 2 axles

Marine Debris and its effects on Sea Turtles

Covers. Now with 75 1/4" [1910] Grade Level Box BULK mm 74.08in BODY DESIGN BODY SPECIFICATIONS FEATURES TESTING CRITERIA

By Hans Frey ¹ ² & Alex Llopis ²

Physical Description Meadow voles are small rodents with legs and tails, bodies, and ears.

EIDER JOURNEY It s Summer Time for Eiders On the Breeding Ground

Florida Fish and Wildlife Conservation Commission Fish and Wildlife Research Institute Guidelines for Marine Turtle Permit Holders

3M Industrial Tapes for Marking. Delivering the durability you need and the versatility you want.

CROATIA State of play Food safety- legislation Establishments upgrading

CITATION AND NOTIFICATION OF PENALTY. We believe that you violated the Animal Welfare Act (7 U.S.C et seq.) (AWA), as described below.

Sheikh Muhammad Abdur Rashid Population ecology and management of Water Monitors, Varanus salvator (Laurenti 1768) at Sungei Buloh Wetland Reserve,

Planning and Zoning Staff Report for Grant Settle Conditonal Use Permit - PH2018-8

Abundance and distribution of Clouded Leopard in Royal Manas National Park A detail Project Report

Transcription:

Annex 29 Final Report of Civil Engineering and Environmental Survey 2014 1/15 Ramboll Finland Oy FI reg.no. 0101197-5, Domicile Espoo

Contents 1. Introduction... 3 2. Arcada II... 3 3. Dog Park... 5 4. Jätkäsaari... 7 5. Länsisalmi... 9 6. Pirttiranta... 9 7. Jätkäsaari III... 10 2/15

1. Introduction The piloting of 2011 includes Arcada II and dog park sites where soft soil, mainly clay, is stabilised. In Arcada the stabilised soft soil is used in replacing the old structure. In Arcada a new light weight stabilisation is being tested in which the density of the stabilised soil is being controlled and reduced by adding water in to the soil. In Dog park abandoned soft soil is used to increase the level of the "ground" in order to prevent the flooding. The soils in Dog park are stabilised to form a stir ground for the dog park activities. Also two other pilots might be implemented during 2011. The first unsure pilot introduced here is the stabilisation in the Jätkäsaari area where a new living area is being built. The last of the introduced pilots is the reinforcement of soil in the Rudus storage area, where new storage area is released to for Rudus. The piloting of 2013 embrace two locations, namely Jätkäsaari III and Honkasuo. According to the plans and the schedule of work progress, it is expected that the stabilisation works in Jätkäsaari III will start in December 2013 and will proceed at the beginning of the year 2014. For the Honkasuo pilot, the preparatory works including sampling, material testing and preliminary planning have started this year and will proceed at the beginning of 2014. It is expected that the stabilisation works will be carried out in the early autumn 2014 and finish before the end of the project. 2. Arcada II Arcada II is located in Kyläsaari, Helsinki. The site is an old road, which was built on top of soft soil by using crushed aggregate. The area has low stability and load bearing capacity. The weight of the aggregate together with the low load bearing soils has caused e.g. the settlement of the mains about one meter lower from the original position even though it was based on friction pile. This has caused deflection on the sewage pipeline and the breakage of a pipe. The mistakes made in the original construction work are now being repaired. In the Figure 1 is represented the Arcada 2 area before construction. 3/15

Figure 1. Arcada 2 before construction. (Google maps) On Figure 2 it can be seen that some of the road has been "pached" with asphalt and the last part of the road has been blocked for entrance. Figure 2. The last part of the road blocked for entrance and the road has been pached with asphalt. (Google maps) Several different tasks are performed in the area which of one (light weight structure) is done to provide information to Absoils project. The work in the area consists of re-constructing a 190 m 4/15

long road (Kyläsaarenkuja), treatment of contaminated soil in the area (the gas stations on Figure 1), lightning excavating and constructing a new junction to Hermanninrantatie. The road is being opened and the aggregate material is dug out of the road. The aggregate material is treated by Rudus and is being reused. The pits from the aggregate area are filled with abandoned soil, which is transported form near located construction site where the clay could not be utilised. Because of the high density of the utilised clay, some water needed to be mixed with the clay to reduce the density of the material. Because of the good stability of the light weight structure, there is no need for cutoff wall, which was used in previous structures on the area. During the pilot is implemented also the improvement of the stabilisation equipment is done. 3. Dog Park New dog park is built in Espoo, Perkkaa as a pilot for the Absoils project. The area of the park is 3 500 m 2 in the land use plan. New dog park must be built because a new building is built on the old dog park site. The soil of the area is soft soil (clay), with low load bearing. Currently the area has some outdoor routes. The vegetation of the area is mainly bushes and young trees. The ground level varies from +0,5 to +1,0 and flood covers the area from time to time. The clay thickness is about 12 14 m and the area is classified as very difficult constructing area of deep soft soil. On the south and west side of the park are some outdoor routes and on the east side of the park is an embankment (level +6). Between the park and the embankment is a flume filled with water. On the northern and southern side of the park are some ditches. Some low ditches are on the future dog park area. The flooding water rises rapidly to these ditches and flumes but they don't have a runoff towards the sea. On the Figure 3 the outdoor route surrounding the Dog park area can be seen. It can also be seen that the vegetation of the area is quite bushy with young trees. 5/15

LI FE09 ENV/FI/575 ABSOILS Figure 3. Outdoor route surrounding the dog park area. On the Figure 4 is the ditch surrounding the dog park area. Figure 4. Ditch surrounding the dog park area. 6/15

A natural gas pipe runs on the northern edge of the area which probably limits the construction work. The ground level of the area needs to be raised to prevent the flooding and the "new" ground level determined in the land use plan is +2 +2,5. For the rising of the ground level, soil material must be transported to the site. The material used is abandoned soft soil material, which is stabilised together with the top soil. The rising of the ground level must be done so that the probable settling is considered. The target is to reduce the flooding to less than once in 20 years. The routes leading to the dog park must be designed to the same level as the dog park. Usually underground waste containers have been used in dog park areas. However, in the site the level of ground water is so high, that the force of buoyancy could lift the containers. The use of some other kinds of waste containers or bins must be considered. The targeted shear strength of the area is about 30 40 kpa. The stabilised area is 5240 m 2 and according to the preliminary calculations the thickness of the stabilisation would be about 3 m and the volume 15720 m 3. No wells for the rain water are built but the drainage is done by inclination. Big openings or holes cannot be formed below the fences of the area, where the dogs could run off, which must be assured by building a good basis for the fences. This will be done by mass stabilisation. The roads that lead there have low load-bearings which cause problems when the transportation of the materials as well as the stabilisation equipment is considered. Thus probably some site access roads must be made. The soil material for the rising of the ground level is probably available from the old dog park area. Also some other construction sites are located near the pilot area where it is possible to get some soil material. The dog park area is a bird reserve area so the constructing can be done only after nesting. For the area there is no other sensible method for the constructing of the dog park except mass stabilisation method. The soil exchange would be a massive operation with high costs and environmentally much worse than the mass stabilisation. No high load bearing is required from the area, so the utilisation amount of binders will be small. The area is owned by ABSOILS steering group member, the city of Espoo. 4. Jätkäsaari Jätkäsaari is a whole new living area, which is being built to Helsinki on an old container harbour area. The area has originally been a group of islands (Jätkäsaari, Hietasaari and Saukko) and the sea area between the islands and the continent has been filled in 1930's, creating a peninsula. The area was built for the harbour area, but since the harbour has moved to Vuosaari in 2008 the area has been freed for better purposes. 7/15

The new design for the area includes filling the sea area a little further and also dredging the fairway as the port for the cruisers, for example to Estonia, stays in the area. The uncontaminated dredged sediments are utilised in the fillings and the contaminated sediments are being treated on the area. The sediments could also be stabilised with by-products in the area and utilised in the park areas and possibly also in the fillings. Also soil material from other sites in Helsinki are utilised in the construction. Also the low quality materials could be utilised there with the use of stabilisation. However the environmental permit of the area does not yet allow the use of by-products in the stabilisation and thus the piloting in the area is not yet confirmed. Figure 5. Jätkäsaari area plan. The striped areas in the end of the peninsula are new areas that are filled in to the sea and the striped areas in the sea are being dredged. The Jätkäsaari area has already a treatment area where they treat for example the contaminated sediments of the area. The stabilisation work is planned to do in basins form where the stabilised mass could be moved to the utilisation site. One good utilisation site would be the "hyväntoivonpuisto" park area. The construction project is long and will continue to year 2024 or even longer. About 3,6 milj.m 3 of fillings are made in the area and about 2,6 milj.m 3 of sediments are being dredged. Some stabilisation with using only cement as a binder has been done in area. The stabilised masses have been moved to the "hyväntoivonpuisto" park area. However the cement stabilisation is not regarded as a part of the Absoils project. 8/15

5. Länsisalmi Länsisalmi is one possible piloting site located in Vantaa. The piloting area is located beside Rudus's storage area where some new field area is released for storage area. The new area was formerly administered by Hyvinkään Tieluiska Oy where they have been refined soil (mould). The area needs to be reinforced as the area is used in future as storage area for Betoroc, rock material and the crushing of the rock material is also planned to be done on the site. The reinforcement is done partially with Betoroc an aggregate product of Rudus made from recycled material. The reinforcement could be done partially also with mass stabilisation by utilising industrial by-products in the stabilisation. 6. Pirttiranta Pirttiranta pilot was built on a site that flooded yearly and the houses on the area were exposed to the flood. On the area a flood embankment was built on abandoned soils. Figure 6. Pirttiranta site before building the flood embankments on dry time. 9/15

LI FE09 ENV/FI/575 ABSOILS Figure 7. Pirttiranta on two different flooding periods on the left side spring flood 1966 and on the right side flooding in 2004. The area was built by a member of the steering group and Ramboll Finland Oy was used as an advisor only in small parts of the project. The Abandoned soils (dry crust clays) were rather dry and were not stabilised. The water content of the abandoned soils was 35 50 % and the strength was about 25 50 kpa. Calculations were made to find out the adequate ground bearing capacity and the stability of the structure. The abandoned soils were transported from close by locations. The total volume of utilised soils was 4 000 m3. 7. Jätkäsaari III Figure 8. The Jätkäsaari area in Helsinki The Jätkäsaari III is a continuation of the Jätkäsaari I and II projects carried out in 2011 and 2012. Jätkäsaari is a whole new living area, which is being built to Helsinki on an old container harbour area. The area has originally been a group of islands (Jätkäsaari, Hietasaari and Saukko) and the sea 10/15

area between the islands and the continent has been filled in 1930's, creating a peninsula. The area was built for the harbour area, but since the harbour has moved to Vuosaari in 2008 the area has been freed for better purposes. The new design for the area includes filling the sea area a little further and also dredging the fairway as the port for the cruisers, for example to Estonia, stays in the area. The uncontaminated dredged sediments are utilised in the fillings and the contaminated sediments are being treated on the area. The sediments could also be stabilised with by-products in the area and utilised in the park areas and possibly also in the fillings. Also soil material from other sites in Helsinki are utilised in the construction. Also the low quality materials could be utilised there with the use of stabilisation. However the environmental permit of the area does not yet allow the use of by-products in the stabilisation and thus the piloting in the area is not yet confirmed. Figure 9. Jätkäsaari area plan. The striped areas in the end of the peninsula are new areas that are filled in to the sea and the striped areas in the sea are being dredged. The Jätkäsaari area has already a treatment area where they treat for example the contaminated sediments of the area. The stabilisation work is planned to do in basins form where the stabilised mass could be moved to the utilisation site. One good utilisation site would be the "hyväntoivonpuisto" park area. The construction project is long and will continue to year 2024 or even longer. About 3,6 milj.m 3 of fillings are made in the area and about 2,6 milj.m 3 of sediments are being dredged. Some stabilisation with using only cement as a binder has been done in area. The stabilised masses have been moved to the "hyväntoivonpuisto" park area. However the cement stabilisation is not regarded as a part of the Absoils project. 11/15

8. Honkasuo Honkasuo is a new area in Helsinki on the border with Vantaa planned for the housing purposes. It has been planned that after construction is finished about 1500 people will live in the area. The project will be carried out in stages and will last for several years. The first stage is preparation of the area and the so called pre-construction. Because the area is challenging from the geotechnological point of view as the soils at the site are mostly peat and soft clay, it will require pre-construction in order to carry on with the infrastructure and house building. Peat and soft clays are too soft and have too low bearing capacity. In the traditional approach, peat and soft clays are excavated and transported to landfill. The current transportation distance in Helsinki is about 40 km. The approach propose by the project includes stabilisation of the peat in situ and the use of surplus soft clays after stabilisation as filling or for the level raising purposes. Figure 10. The aerial photo of Honkasuo in 1976 12/15

Figure 11. The current aerial picture of the Honkasuo area. 13/15

Figure 12. The location of the Honkasuo pilot area. Figure 13. Current situation in the Honkasuo area. 14/15

Figure 15. Activities foreseen in the pilot area. 15/15