Hydraulic Report. County Road 595 Bridge over Yellow Dog River. Prepared By AECOM Brian A. Hintsala, P.E

Size: px
Start display at page:

Download "Hydraulic Report. County Road 595 Bridge over Yellow Dog River. Prepared By AECOM Brian A. Hintsala, P.E"

Transcription

1 Prepared for: Prepared by: Marquette County Road Commission AECOM Ishpeming, MI Marquette, MI December 9, 2011 Hydraulic Report County Road 595 Bridge over Yellow Dog River Prepared By AECOM Brian A. Hintsala, P.E

2 AECOM i Contents 1.0 Introduction Method of Analysis Variables and Coefficients Starting Point Discussion Conclusion... 2 List of Appendices Appendix A HEC-RAS Computations Appendix B Profile Sheets Appendix C Topographic Map HEC-RAS River Sections Appendix D Bridge Plans Appendix E Cross Sections Appendix F Damage Waivers Appendix G Flow Rates Appendix H Site Photographs Appendix I USGS Topographical Map and River Gradient Calculations

3 AECOM Introduction This hydraulic report is being prepared for the Marquette County Road Commission concerning the proposed County Road 595 crossing of the Yellow Dog River. The site is located in Section 13 of T50N, R29W, Quad Map Name Silver Lake Basin (Lat /Long ) in Michigamme Township, Marquette County. Multiple road alignments were investigated. The chosen alignment crosses the river at the site of an existing bridge. The existing bridge, however, is both structurally and geometrically inadequate for the projected road traffic and requires replacement. 2.0 Method of Analysis The hydraulic analysis was performed using the HEC-RAS River Analysis System computer program, Version developed by the U.S. Army Corps of Engineers Hydraulic Engineering Center. The steady flow data for the flood events were obtained from the Michigan Department of Environmental Quality (MDEQ). Flood flow events with reoccurrence intervals up to 500 years were modeled and checked against the low chord elevation of the bridge. 3.0 Variables and Coefficients The river sections near the bridge use an expansion coefficient of 0.30 and contraction coefficient of 0.50 which are suitable for a typical bridge per Table 3.3 of the HEC-RAS Hydraulic Reference Manual. The Manning s n-values for friction loss were selected using Table 3.1 of the HEC-RAS Hydraulic Reference Manual. The main channel is fairly uniform with some weeds and rocks so a value of was chosen. The overbanks are swampy areas covered with heavy brush so a value of was chosen. Representative photographs of the site are included in Appendix H. 4.0 Starting Point The starting point of the analysis was a surveyed river section about 2140 feet downstream of the proposed road. This location was chosen because it was far enough downstream to be outside of the influence of the proposed bridge. The starting water surface elevation was calculated by HEC-RAS using the slope-conveyance method. An average channel slope of was estimated from a USGS quadrangle map and used for the normal depth boundary condition. The calculations are included in Appendix I. 5.0 Discussion The main channel of the Yellow Dog River is well defined and at the 10-year flood event conveys the bulk of the flow. At the 100-year flood event the main channel generally conveys more than 70% of the flow with the rest being carried by the overbank floodplains. The river gradient is relatively flat and the flow regime is sub-critical for all flood events. The existing bridge has a 12 foot wide timber deck supported by steel beams which span 40 feet. There are no abutments with the bridge founded directly on the river banks. The banks have been built-up to raise the bridge and have some stone riprap protecting the front slopes. The built-up banks

4 AECOM 2 form an artificial constriction on the original channel and will be removed as part of the proposed bridge project. This is indicated on the bridge plans in Appendix D. The proposed bridge includes a pre-cast concrete beam super structure with a span of 55 feet. The box beams will be placed directly adjacent to each other and also form the bridge deck. The concrete abutments are supported by driven steel piles. The restored stream banks will be protected with heavy riprap which is sized and placed in accordance with the Michigan Department of Transportation 2003 Standard Specifications for Construction. The proposed bridge will be placed directly over the location of the existing bridge (after is removed). The river cross sections are placed in HEC-RAS at the distances measured along the center line of the channel. In some cases the surveyed sections on each side of the bridge were adjusted up or downstream as required to model the bridge using the standard bridge/culvert input section of HEC- RAS. This is required because the actual location of the bridge was not known when the survey was performed. The final positions of the sections are shown in the plan view in Appendix C. The proposed road approach on the right side of the bridge cuts off a portion of the overbank flow during the higher flow events. Ineffective flow areas were included in the right overbank portions of the cross sections upstream and downstream of the bridge as suggested in chapter 5 of the HEC- RAS Hydraulic Reference Manual. The left overbank near the bridge is higher than all the flood water elevations, so ineffective flow areas were not required on the left side. Ineffective flow areas were not used for the existing condition because the existing road is relatively low and there is potential for overbank flow. Since the existing bridge encroaches on the main channel, the proposed bridge has a larger span. This reduces the water velocity and upstream water elevation for the proposed bridge. Table 1 on the following page summarizes the key model results for two configurations: 1. The existing 40 span bridge. 2. The proposed 55 span bridge. 6.0 Conclusion Analysis results indicate that the proposed bridge decreases water surface elevations and channel velocities for all of the flow events compared to the existing bridge.

5 Hydraulic Comparison of Various Bridge Options 3 County Road 595 Bridge Design Yellow Dog River 4/3/2010 Table 1 HEC-RAS Analysis Results Velocity in Channel at Bridge River Station 4.5 Flow thru Bridge Water Surface Elevation at Upstream Face of Bridge River Station 5 Energy Gradient Elev at Upstream Face of Bridge River Station 5 Energy Gradient Elevation at 1560' Upstream of Bridge River Station 9 (ft/sec) (cfs) (feet) (feet) (feet) Model Configuration 100 Year 10 Year 100 Year 100 Year 500 Year 100 Year 100 Year (600 cfs) (170 cfs) (600 cfs) (600 cfs) (1100 cfs) (600 cfs) Change (600 cfs) Change Existing Bridge Proposed Bridge

6 AECOM Appendix A HEC-RAS Computations

7 AECOM Computations The HEC-RAS data files are included in a separate electronic folder named: HEC-RAS_Yellow Dog.zip In order to provide a brief summary of the analysis results, a Profile Output Table for the existing and proposed conditions are included on the following pages.

8 HEC-RAS Plan: Original Str River: Yellow Dog Reach: Yellow Dog Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) Yellow Dog 9 10 Year Yellow Dog 9 50 Year Yellow Dog Year Yellow Dog Year Yellow Dog 8 10 Year Yellow Dog 8 50 Year Yellow Dog Year Yellow Dog Year Yellow Dog 7 10 Year Yellow Dog 7 50 Year Yellow Dog Year Yellow Dog Year Yellow Dog 6 10 Year Yellow Dog 6 50 Year Yellow Dog Year Yellow Dog Year Yellow Dog 5 10 Year Yellow Dog 5 50 Year Yellow Dog Year Yellow Dog Year Yellow Dog 4.5 BR U 10 Year Yellow Dog 4.5 BR U 50 Year Yellow Dog 4.5 BR U 100 Year Yellow Dog 4.5 BR U 500 Year Yellow Dog 4.5 BR D 10 Year Yellow Dog 4.5 BR D 50 Year Yellow Dog 4.5 BR D 100 Year Yellow Dog 4.5 BR D 500 Year Yellow Dog 4 10 Year Yellow Dog 4 50 Year Yellow Dog Year Yellow Dog Year Yellow Dog 3 10 Year Yellow Dog 3 50 Year Yellow Dog Year Yellow Dog Year Yellow Dog 2 10 Year Yellow Dog 2 50 Year Yellow Dog Year Yellow Dog Year Yellow Dog 1 10 Year Yellow Dog 1 50 Year Yellow Dog Year Yellow Dog Year

9 HEC-RAS Plan: 55 Br at 4.5 River: Yellow Dog Reach: Yellow Dog Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) Yellow Dog 9 10 Year Yellow Dog 9 50 Year Yellow Dog Year Yellow Dog Year Yellow Dog 8 10 Year Yellow Dog 8 50 Year Yellow Dog Year Yellow Dog Year Yellow Dog 7 10 Year Yellow Dog 7 50 Year Yellow Dog Year Yellow Dog Year Yellow Dog 6 10 Year Yellow Dog 6 50 Year Yellow Dog Year Yellow Dog Year Yellow Dog 5 10 Year Yellow Dog 5 50 Year Yellow Dog Year Yellow Dog Year Yellow Dog 4.5 BR U 10 Year Yellow Dog 4.5 BR U 50 Year Yellow Dog 4.5 BR U 100 Year Yellow Dog 4.5 BR U 500 Year Yellow Dog 4.5 BR D 10 Year Yellow Dog 4.5 BR D 50 Year Yellow Dog 4.5 BR D 100 Year Yellow Dog 4.5 BR D 500 Year Yellow Dog 4 10 Year Yellow Dog 4 50 Year Yellow Dog Year Yellow Dog Year Yellow Dog 3 10 Year Yellow Dog 3 50 Year Yellow Dog Year Yellow Dog Year Yellow Dog 2 10 Year Yellow Dog 2 50 Year Yellow Dog Year Yellow Dog Year Yellow Dog 1 10 Year Yellow Dog 1 50 Year Yellow Dog Year Yellow Dog Year

10 AECOM Appendix B Profile Sheets

11 Kennecott Eagle Mine - Yellow Dog Plan: Original Structure 4/3/2010 Yellow Dog Yellow Dog Legend EG 500 Year WS 500 Year EG 100 Year WS 100 Year EG 50 Year WS 50 Year Crit 500 Year Crit 100 Year EG 10 Year WS 10 Year Elevation (ft) 1414 Crit 50 Year Crit 10 Year Ground Main Channel Distance (ft)

12 Kennecott Eagle Mine - Yellow Dog Plan: NEW BRDG 55 FT, Located over existing br 4/3/2010 Yellow Dog Yellow Dog Legend EG 500 Year WS 500 Year EG 100 Year WS 100 Year EG 50 Year WS 50 Year Crit 500 Year Crit 100 Year EG 10 Year WS 10 Year Elevation (ft) 1414 Crit 50 Year Crit 10 Year Ground Main Channel Distance (ft)

13 AECOM Appendix C Topographic Map HEC-RAS River Sections

14 Project Map Figure 1a Yellow Dog River Crossing November 21, 2007 Lake Superior Marquette Ishpeming Negaunee Symbol Legend Final Route Section Lines Stream Location Key Map (Marquette County, Michigan) 0 I 200 Page 1 of inch equals 400 feet

15 AECOM Appendix D Bridge Plans

16

17

18 AECOM Appendix E Cross Sections

19 AECOM Cross Section Cross sections are included for the existing condition and the proposed bridge condition.

20 AECOM Existing Channel Condition

21

22

23

24

25

26

27

28

29

30

31 AECOM Proposed Bridge Condition

32

33

34

35

36

37

38

39

40

41

42 AECOM Appendix F Damage Waivers

43 AECOM No Damage Waivers Required

44 AECOM Appendix G Flow Rates

45 DEQ - Flood Frequency Discharges Page 1 of 1 12/12/2011 Joint Permit Application DEQ Home CIWPIS Online Services Permits Programs Site Map Contact DEQ Flood Discharge Request Record /12/2011 Home Water Management Lowflows Discharge Requests Watersheds Map Discharge Information Watercourse: YELLOW DOG RIVER Location: Clowery Road Drainage Area: mi 2 Basin Name: 48L - Falls (Lake) Contributing Area: mi 2 County: Marquette Tn/Rng/Sec: 50N29W/13 Township: Michigamme Latitude: Quad Name: Silver Lake Basin Longitude: Quad ID: D11NE Requested By: Sheila Meier (DEQ-LWM- Received Date: 11/23/2011 Ishpeming) Request Type: Trans. - County Issued Date: 12/5/2011 File Number: Reference Number: Discharge Frequencies: Volume Frequencies: 10%: 170 cfs 2%: 420 cfs 1%: 600 cfs 1%: 2200 acre-ft 0.5%: 750 cfs 0.5%: 2800 acre-ft 0.2%: 1100 cfs Access to the Flood Flow Database is provided as a service to allow you to check the status of your flood flow requests or to view discharges from previous requests for preliminary design purposes. The discharges values are only valid for the original requestor and for one year after the original request date. To obtain discharge information from the Hydrologic Studies Program, a flood flow discharge request form may be submitted electronically to the DEQ. A written or response to your request will be returned to you and must accompany your permit application. Michigan.gov Home DEQ_Home Online Services Permits Programs Site Map Contact_DEQ State Web Sites Privacy Policy Link Policy Accessibility Policy Security Policy Copyright 2011 State of Michigan

46 AECOM Appendix H Photos

47 County Road 595 over the Yellow Dog River.DOC Existing Bridge Looking NE Looking Upstream from Existing Bridge

48 County Road 595 over the Yellow Dog River.DOC Looking Upstream from Existing Bridge Looking Upstream from Existing Bridge

49 County Road 595 over the Yellow Dog River.DOC Looking Downstream from Existing Bridge Looking Downstream from Existing Bridge

50 County Road 595 over the Yellow Dog River.DOC Existing Bridge Looking Downstream Approach to Existing Bridge

51 AECOM Appendix I USGS Topographical Map and River Gradient Calculations Map includes portions of Quadrangle maps: Bulldog Lake Silver Lake Basin

52 087 54' 0.00" W ' 0.00" W ' 0.00" W ' 0.00" W ' 0.00" N ' 0.00" N ' 0.00" N ' 0.00" N ' 0.00" N ' 0.00" N Proposed bridge location Yellow Dog River 5m Intv 5m diff =16.4' = 16.4/13,497'= or 0.12% W ' 0.00" W ' 0.00" W ' 0.00" W ' 0.00" W Copyright (C) 1999, Maptech, Inc.

Representative Site Photographs North Branch Pigeon Creek Mitigation Bank

Representative Site Photographs North Branch Pigeon Creek Mitigation Bank Photo 1 Unnamed tributary as it enters the Site from neighboring western property through culvert. Photo 2 Unnamed tributary riparian zone and adjacent upland. Photo 3 A head-cut erosion indicating instability

More information

BLACKSTONE RIVER FLOOD-CONTROL PROJECT AT WOONSOCKET, RHODE ISLAND

BLACKSTONE RIVER FLOOD-CONTROL PROJECT AT WOONSOCKET, RHODE ISLAND BLACKSTONE RIVER FLOOD-CONTROL PROJECT AT WOONSOCKET, RHODE ISLAND Hydraulic Model Investigation TECHNICAL REPORT NO. 2-468 December 1957 U. S. Army Engineer Waterways Experiment Station CORPS OF ENGINEERS

More information

SOSSAMAN CLOUD PARK. Site Conditions

SOSSAMAN CLOUD PARK. Site Conditions SOSSAMAN CLOUD PARK distant views of the Superstition Mountains to the northeast. A series of dirt roads are visible throughout the site and trash and debris from local neighborhoods are present. A graded

More information

Amendment to the Engineer s Report for the Devine Municipal Drain. The City of Ottawa Cumberland Ward January 21, Prepared for: City of Ottawa

Amendment to the Engineer s Report for the Devine Municipal Drain. The City of Ottawa Cumberland Ward January 21, Prepared for: City of Ottawa Amendment to the Engineer s Report for the Devine Municipal Drain The City of Ottawa Cumberland Ward January 21, 2015 Prepared for: City of Ottawa Prepared by: Stantec Consulting Ltd. Sign-off Sheet This

More information

Big Chino Valley Pumped Storage Project (FERC No ) Desert Tortoise Study Plan

Big Chino Valley Pumped Storage Project (FERC No ) Desert Tortoise Study Plan November 16, 2018 1.0 Introduction Big Chino Valley Pumped Storage LLC, a subsidiary of ITC Holdings Corp. (ITC), submitted a Pre- Application Document (PAD) and Notice of Intent to file an Application

More information

COUNTY OF LINCOLN, NORTH CAROLINA

COUNTY OF LINCOLN, NORTH CAROLINA COUNTY OF LINCOLN, NORTH CAROLINA 302 NORTH ACADEMY STREET, SUITE A, LINCOLNTON, NORTH CAROLINA 28092 PLANNING AND INSPECTIONS DEPARTMENT 704-736-8440 OFFICE 704-732-9010 FAX To: Alex Patton, Board of

More information

Wattle Application on Linear Projects

Wattle Application on Linear Projects Wattle Application on Linear Projects Barney Blackburn, PE, CPESC, CPSWQ NCDOT Roadside Environmental Unit Soil & Water Engineering Section Supervisor What is a Wattle? Anatomical definition* a fleshy

More information

2019 Broomfield Bald Eagle Watch Data Sheet

2019 Broomfield Bald Eagle Watch Data Sheet 2019 Broomfield Bald Eagle Watch Data Sheet Site Code Date Start Time End Time Observer Observation Pt. Sky Code Number of adult Bald Eagles detected 2 SL 1/7/2019 8:20:00AM 9:50:00AM HNG A PC Number of

More information

2019 Broomfield Bald Eagle Watch Data Sheet

2019 Broomfield Bald Eagle Watch Data Sheet 2019 Broomfield Bald Eagle Watch Data Sheet Site Code Date Start Time End Time Observer Observation Pt. Sky Code Number of adult Bald Eagles detected 2 SL 3/5/2019 8:20 12:20 HNG A and Car PC Number of

More information

Kansas Department of Transportation DISTRICT 6. Project(s): Max: Min:

Kansas Department of Transportation DISTRICT 6. Project(s): Max: Min: Page 1 of 30 SECTION: 01 COMMON ITEMS Cat Alt Set: Cat Alt Member: LCC: 1 020100 CONTRACTOR CONSTRUCTION STAKING 2 025600 FIELD OFFICE AND LABORATORY (TYPE A) 3 025323 MOBILIZATION 4 070626 MOBILIZATION

More information

ALL ABOUT: FOAM SEDIMENT CONTROL WATTLES

ALL ABOUT: FOAM SEDIMENT CONTROL WATTLES ALL ABOUT: FOAM SEDIMENT CONTROL WATTLES STANDARD AND EXTREME WATTLES Both are 6-inch diameter x 25-feet long. Both are made from heavy 6-oz monofilament UV resistant geotextile with 100-gpm/sf flowrate.

More information

AN ASSESSMENTT OF THE BALD EAGLE AND GREAT BLUE HERON BREEDING POPULATIONS ALONG HIGH ROCK, TUCKERTOWN, NARROWS, AND FALLS RESERVOIRS

AN ASSESSMENTT OF THE BALD EAGLE AND GREAT BLUE HERON BREEDING POPULATIONS ALONG HIGH ROCK, TUCKERTOWN, NARROWS, AND FALLS RESERVOIRS AN ASSESSMENTT OF THE BALD EAGLE AND GREAT BLUE HERON BREEDING POPULATIONS ALONG HIGH ROCK, TUCKERTOWN, NARROWS, AND FALLS RESERVOIRS IN CENTRAL NORTH CAROLINA: 2004 BREEDING SEASON A COOPERATIVE PROJECT

More information

ALL ABOUT: FOAM SEDIMENT CONTROL WATTLES

ALL ABOUT: FOAM SEDIMENT CONTROL WATTLES ALL ABOUT: FOAM SEDIMENT CONTROL WATTLES STANDARD AND EXTREME WATTLES Both are 6-inch diameter x 25-feet long. Both are made from heavy 6-oz monofilament UV resistant geotextile with 100-gpm/sf flowrate.

More information

2019 Broomfield Bald Eagle Watch Data Sheet

2019 Broomfield Bald Eagle Watch Data Sheet 219 Broomfield Bald Eagle Watch Data Sheet Site Code Date Start Time End Time Observer Number of adult Bald Eagles detected 1 SL 1/2/219 3:35pm 5:5pm TR Number of nestlings detected Number of fledglings

More information

Water vole survey on Laughton Level via Mill Farm

Water vole survey on Laughton Level via Mill Farm Water vole survey on Laughton Level via Mill Farm Grid reference: TQ 4911 Mill Farm, Ripe, East Sussex November 2008 Hetty Wakeford Ecologist Sussex Ecology Introduction The Ecologist undertook a water

More information

2019 Broomfield Bald Eagle Watch Data Sheet

2019 Broomfield Bald Eagle Watch Data Sheet 2019 Broomfield Bald Eagle Watch Data Sheet Site Code Date Start Time End Time Observer Observation Pt. Sky Code Number of adult Bald Eagles detected 2 SL 3/7/2019 8:20 12:20 NHH A FH Number of nestlings

More information

2019 Broomfield Bald Eagle Watch Data Sheet

2019 Broomfield Bald Eagle Watch Data Sheet 2019 Broomfield Bald Eagle Watch Data Sheet Site Code Date Start Time End Time Observer Observation Pt. Sky Code Number of adult Bald Eagles detected 2 SL 1/8/2019 13:30 15:12 RDB A PC Number of nestlings

More information

27% 79K CAYUGA COUNTY, NY: PROFILE COMMUNITY CHARACTERISTICS

27% 79K CAYUGA COUNTY, NY: PROFILE COMMUNITY CHARACTERISTICS CAYUGA COUNTY, NY: PROFILE Cayuga County is located on Lake Ontario, which spans across 193 miles and includes four watersheds: Chaumont-Perch, Black River, St. Lawrence River, and Salmon-Sandy. AVERAGE

More information

2019 Broomfield Bald Eagle Watch Data Sheet

2019 Broomfield Bald Eagle Watch Data Sheet 2019 Broomfield Bald Eagle Watch Data Sheet Site Code Date Start Time End Time Observer Observation Pt. Sky Code Number of adult Bald Eagles detected 2 SL 2/22/2019 12:17 PM 14:35 MV A PC Number of nestlings

More information

Cheltenham Mall and Upper Rock Creek Litter and Creek Trash Photo Survey

Cheltenham Mall and Upper Rock Creek Litter and Creek Trash Photo Survey Cheltenham Mall and Upper Rock Creek Litter and Creek Trash Photo Survey Cheltenham Mall Litter and Creek Trash Photo Survey Area Visual monitoring around the Cheltenham Mall parking lot and Rock Creek

More information

Nest Site Creation and Maintenance as an Effective Tool in Species Recovery

Nest Site Creation and Maintenance as an Effective Tool in Species Recovery Nest Site Creation and Maintenance as an Effective Tool in Species Recovery Scott D. Gillingwater Species At Risk Biologist Upper Thames River Conservation Authority Where and Why? The successful creation

More information

Impacts of Hydrologic Change on Sandbar Nesting Availability for Riverine Turtles in Eastern Minnesota, USA

Impacts of Hydrologic Change on Sandbar Nesting Availability for Riverine Turtles in Eastern Minnesota, USA Water 2013, 5, 1243-1261; doi:10.3390/w5031243 Article OPEN ACCESS water ISSN 2073-4441 www.mdpi.com/journal/water Impacts of Hydrologic Change on Sandbar Nesting Availability for Riverine Turtles in Eastern

More information

Using a Spatially Explicit Crocodile Population Model to Predict Potential Impacts of Sea Level Rise and Everglades Restoration Alternatives

Using a Spatially Explicit Crocodile Population Model to Predict Potential Impacts of Sea Level Rise and Everglades Restoration Alternatives Using a Spatially Explicit Crocodile Population Model to Predict Potential Impacts of Sea Level Rise and Everglades Restoration Alternatives Tim Green, Daniel Slone, Michael Cherkiss, Frank Mazzotti, Eric

More information

Rock Wren Nesting in an Artificial Rock Wall in Folsom, Sacramento County, California

Rock Wren Nesting in an Artificial Rock Wall in Folsom, Sacramento County, California Rock Wren Nesting in an Artificial Rock Wall in Folsom, Sacramento County, California Dan Brown P.O. Box 277773, Sacramento, CA 95827 naturestoc@aol.com Daniel A. Airola, Northwest Hydraulic Consultants,

More information

A REPTILE SURVEY AT THE LAND AT HILL ROAD AND ELM TREE DRIVE, ROCHESTER, KENT,

A REPTILE SURVEY AT THE LAND AT HILL ROAD AND ELM TREE DRIVE, ROCHESTER, KENT, A REPTILE SURVEY AT THE LAND AT HILL ROAD AND ELM TREE DRIVE, ROCHESTER, KENT, Commissioned by: King & Johnston Homes Ltd and Medway Council Report Number: October 2013 Regent s Place, 3 rd Floor, 338

More information

Monitoring Wetland Functional Recovery of Bottomland Hardwood Sites in the Yazoo Basin, MS

Monitoring Wetland Functional Recovery of Bottomland Hardwood Sites in the Yazoo Basin, MS Monitoring Wetland Functional Recovery of Bottomland Hardwood Sites in the Yazoo Basin, MS by Monica N. Humphrey, Jeff P. Lin, Barbara A. Kleiss, and Darrell E. Evans PURPOSE: The U.S. Army Corps of Engineers

More information

The Heifer Facility Puzzle: The New Puzzle Pieces

The Heifer Facility Puzzle: The New Puzzle Pieces The Heifer Facility Puzzle: The New Puzzle Pieces Joe Harner Biological and Agricultural Engineering Kansas State University Manhattan, KS jharner@ksu.edu / 785.532.2900 Dan McFarland Sr Extension Educator

More information

Property and infrastructure 1. INTRODUCTION. 1.1 Background. 1.2 Survey Site. Date

Property and infrastructure 1. INTRODUCTION. 1.1 Background. 1.2 Survey Site. Date Date 06-6-2018 Tamara Lanoix Unit 1a, Vantage House Vantage Park Washingley Road Huntingdon Cambs PE29 6SR Dear Tamara Subject Water Vole Survey Results - Chesterton Bridge 1. INTRODUCTION 1.1 Background

More information

Planning and Zoning Staff Report for Grant Settle Conditonal Use Permit - PH2018-8

Planning and Zoning Staff Report for Grant Settle Conditonal Use Permit - PH2018-8 Planning and Zoning Staff Report for Grant Settle Conditonal Use Permit - PH2018-8 Hearing Date: March 15, 2018 Development Services Department Owner/Applicant: Grant Settle Staff: Dan Lister, (208) 455-5959

More information

San Francisco 2014 Litter Study

San Francisco 2014 Litter Study June 3, 2014 Prepared for City and County of San Francisco Office of the Controller and Department of the Environment 1455 Market Street, Suite 1 San Francisco, CA 94103 Prepared by HDR 560 Mission Street,

More information

THE HOOVER DAM EXPERIENCE

THE HOOVER DAM EXPERIENCE THE HOOVER DAM EXPERIENCE By Crystal Elsasser At 726 feet high the Hoover Dam is a gigantic, awe inspiring, engineering wonder. Seeing the Hoover Dam has always been on my bucket list, and finally this

More information

Representation, Visualization and Querying of Sea Turtle Migrations Using the MLPQ Constraint Database System

Representation, Visualization and Querying of Sea Turtle Migrations Using the MLPQ Constraint Database System Representation, Visualization and Querying of Sea Turtle Migrations Using the MLPQ Constraint Database System SEMERE WOLDEMARIAM and PETER Z. REVESZ Department of Computer Science and Engineering University

More information

Effects of Cage Stocking Density on Feeding Behaviors of Group-Housed Laying Hens

Effects of Cage Stocking Density on Feeding Behaviors of Group-Housed Laying Hens AS 651 ASL R2018 2005 Effects of Cage Stocking Density on Feeding Behaviors of Group-Housed Laying Hens R. N. Cook Iowa State University Hongwei Xin Iowa State University, hxin@iastate.edu Recommended

More information

Jay Calderwood Life during the Teton Flood. Box 5 Folder 28

Jay Calderwood Life during the Teton Flood. Box 5 Folder 28 The Teton Dam Disaster Collection Jay Calderwood Life during the Teton Flood By Jay Calderwood February 15, 2004 Box 5 Folder 28 Oral Interview conducted by Alyn B. Andrus Transcript copied by Sarah McCorristin

More information

September Prepared by. The Howard T. Odum Florida Springs Institute

September Prepared by. The Howard T. Odum Florida Springs Institute September 2017 Prepared by The Howard T. Odum Florida Springs Institute Table of Contents Middle Suwannee River Springs Restoration Plan Figures... v Tables... vii Acknowledgments... 1 Executive Summary...

More information

E. E. E." M.E. the trap body through the annular air inlet.

E. E. E. M.E. the trap body through the annular air inlet. USOO5768748A United States Patent (19) 11 Patent Number: Silvera et al. (45) Date of Patent: Jun. 23, 1998 54) VACUUM ATTACHMENT FOR GROOMING 2.953,808 9/1960 Carmack... 15/402 CATS AND DOGS 3,574,885

More information

COUNTY OF ALBEMARLE STAFF REPORT SUMMARY

COUNTY OF ALBEMARLE STAFF REPORT SUMMARY COUNTY OF ALBEMARLE STAFF REPORT SUMMARY Project Name: SP201000008 The Canine Clipper Dog Grooming and Boarding Planning Commission Public Hearing: July 27, 2010 Owner: Amy Peloquin Acreage: 6.126 Staff:

More information

The ultimate flexibility in pullet cage systems

The ultimate flexibility in pullet cage systems Pullet Cages The ultimate flexibility in pullet cage systems Big Dutchman offers you the ultimate flexibility in pullet cage systems, with a variety of cage styles to meet your specific needs. Choose the

More information

Subject: Preliminary Draft Technical Memorandum Number Silver Lake Waterfowl Survey

Subject: Preliminary Draft Technical Memorandum Number Silver Lake Waterfowl Survey 12 July 2002 Planning and Resource Management for Our Communities and the Environment Scott E. Shewbridge, Ph.D., P.E., G.E. Senior Engineer - Hydroelectric Eldorado Irrigation District 2890 Mosquito Road

More information

Hope in the making. Belayneh Akalu March 08, 2013

Hope in the making. Belayneh Akalu March 08, 2013 Hope in the making Belayneh Akalu March 08, 2013 As one of the most discussed issues in our country these days, the grand renaissance dam has enjoyed wide media coverage. Both the electronic and print

More information

Versatile Coir Wattles Offer Cost-Effective Sediment Control at Construction Sites

Versatile Coir Wattles Offer Cost-Effective Sediment Control at Construction Sites Versatile Coir Wattles Offer Cost-Effective Sediment Control at Construction Sites RoLanka International 2004 More and more erosion and sediment control professionals are discovering the advantages of

More information

Complete Solutions for BROILER BREEDERS

Complete Solutions for BROILER BREEDERS Complete Solutions for BROILER BREEDERS Global Presence Local Commitment Feeding Drinking Climate Housing Complete Broiler Breeder Packages Broiler-Breeders We at Plasson are aware that the main goal in

More information

The Herpetofauna and Ichthyofauna of the Cucumber Creek Watershed in the Ouachita Mountains, LeFlore County, Oklahoma

The Herpetofauna and Ichthyofauna of the Cucumber Creek Watershed in the Ouachita Mountains, LeFlore County, Oklahoma 43 The Herpetofauna and Ichthyofauna of the Cucumber Creek Watershed in the Ouachita Mountains, LeFlore County, Oklahoma William I. Lutterschmidt and Christopher M. Taylor¹ Department of Zoology and Oklahoma

More information

Interstate-5, Exit 260 Slater Road. Corridor Report and Preliminary Interchange Justification Evaluation

Interstate-5, Exit 260 Slater Road. Corridor Report and Preliminary Interchange Justification Evaluation Interstate-5, Exit 260 Slater Road Corridor Report and Preliminary Interchange Justification Evaluation August 2013 Prepared By: Gibson Traffic Consultants, Inc. 2802 Wetmore Avenue Suite 220 Everett,

More information

Platte River Recovery Implementation Program

Platte River Recovery Implementation Program Platte River Recovery Implementation Program 2008 2009 Interior Least Tern and Piping Plover Monitoring and Research Report for the Central Platte River, Nebraska. Prepared for: Governance Committee Prepared

More information

Z Purlins C Sections Eaves Beams

Z Purlins C Sections Eaves Beams SECtion ProPErtiES A n d l o a d t a b l E S w w w. a l b i o n s e c t i o n s. c o. u k Z Purlins C Sections Eaves Beams raising your expectations text text Introduction to load tables This brochure

More information

PEREGRINE FALCON HABITAT MANAGEMENT GUIDELINES ONTARIO MINISTRY OF NATURAL RESOURCES

PEREGRINE FALCON HABITAT MANAGEMENT GUIDELINES ONTARIO MINISTRY OF NATURAL RESOURCES PEREGRINE FALCON HABITAT MANAGEMENT GUIDELINES ONTARIO MINISTRY OF NATURAL RESOURCES December 1987 2 Table of Contents Page Introduction...3 Guidelines...4 References...7 Peregrine Falcon Nest Site Management

More information

DIGITUS Network Cabinet Unique Series, 600, 800 mm width - 600, 800, 1000, 1200 mm depth

DIGITUS Network Cabinet Unique Series, 600, 800 mm width - 600, 800, 1000, 1200 mm depth DIGITUS Network Cabinet Unique Series 1.5 mm strong sheet steel Loading capacity up to 800 kg Available in color grey and black Large range of equipment available Abstract DIGITUS Network Cabinet Unique

More information

Platte River Recovery Implementation Program

Platte River Recovery Implementation Program Platte River Recovery Implementation Program 2015 Interior Least Tern and Piping Plover Monitoring and Research Report for the Central Platte River, Nebraska. Prepared for: Governance Committee Prepared

More information

Sample Paper HEC CAT A

Sample Paper HEC CAT A Sample Paper HEC CAT A Sample Paper HEC CAT A 1 VERBAL Complete the sentences by choosing the most appropriate word, from the given lettered choices (A to D) below each. 1. A son was born her. A. to B.

More information

SPRING STUDIES OF DALL SHEEP ALONG THE NORTHWEST ALASKAN PIPELINE ROUTE. Final Report. Prepared for and Funded by. Northwest Alaskan Pipeline Company

SPRING STUDIES OF DALL SHEEP ALONG THE NORTHWEST ALASKAN PIPELINE ROUTE. Final Report. Prepared for and Funded by. Northwest Alaskan Pipeline Company ALASKA RESOURCES USRARY Bureau of Land Manaoement SPRING STUDIES OF DALL SHEEP ALONG THE NORTHWEST ALASKAN PIPELINE ROUTE Final Report Prepared for and Funded by Northwest Alaskan Pipeline Company under

More information

Using social media research methods to identify hidden churches

Using social media research methods to identify hidden churches Using social media research methods to identify hidden churches Anthony-Paul Cooper CofE Faith in Research Conference 2014 4th June 2014 Overview The research described in this presentation is part of

More information

Response to SERO sea turtle density analysis from 2007 aerial surveys of the eastern Gulf of Mexico: June 9, 2009

Response to SERO sea turtle density analysis from 2007 aerial surveys of the eastern Gulf of Mexico: June 9, 2009 Response to SERO sea turtle density analysis from 27 aerial surveys of the eastern Gulf of Mexico: June 9, 29 Lance P. Garrison Protected Species and Biodiversity Division Southeast Fisheries Science Center

More information

2017 Turtle Observations in the Jack Lake Watershed

2017 Turtle Observations in the Jack Lake Watershed 2017 Turtle Observations in the Jack Lake Watershed Steven J. Kerr Jack Lake Association 2017 2017 Turtle Observations in the Jack Lake Watershed Steven J. Kerr Jack Lake Association October, 2017 This

More information

Notes and INFORMATION

Notes and INFORMATION Back to index ITEM # PT116R EQUIPMENT INFORMATION SHEET Notes and Abbreviations PET CONNECTION Link to PDF file CONTRACTOR QTY INFORMATION UTILITY INFORMATION EXT NEW MODEL # ITEM DESCRIPTION MANUFACTURER

More information

Proposal for a secure off-lead Dog Exercise area for Renwick (Dog Park) prepared by. Jane Buckman and Sue Macdonald. May 2017

Proposal for a secure off-lead Dog Exercise area for Renwick (Dog Park) prepared by. Jane Buckman and Sue Macdonald. May 2017 Proposal for a secure off-lead Dog Exercise area for Renwick (Dog Park) prepared by We wish to speak to this submission Jane Buckman and Sue Macdonald. May 2017 Background: Why has getting to here taken

More information

Jupiter/Carlin Nourishment A Case of Adaptive Management, Cooperation and Innovative Applications

Jupiter/Carlin Nourishment A Case of Adaptive Management, Cooperation and Innovative Applications Jupiter/Carlin Nourishment A Case of Adaptive Management, Cooperation and Innovative Applications Michael Stahl and Kelly Martin National Conference on Beach Preservation Technology February 4, 2016 Jupiter/Carlin

More information

OPINIONS BY MARK C. JORGENSEN MAY 2, 2012

OPINIONS BY MARK C. JORGENSEN MAY 2, 2012 COMMENTS ON THE BIOLOGICAL OPINION (BO) OF THE US FISH & WILDLIFE SERVICE (USF&WS) TO THE BUREAU OF LAND MANAGEMENT (BLM) REGARDING THE OCOTILLO WIND ENERGY FACILITY OPINIONS BY MARK C. JORGENSEN MAY 2,

More information

january 28, 2013 Dear Councilman Reyes and Members of the Ad Hoc River Committee:

january 28, 2013 Dear Councilman Reyes and Members of the Ad Hoc River Committee: Andrea Ventura 4111 Chevy Chase Drive Los Angeles, CA 90039 january 28, 2013 Councilman Ed P. Reyes Ad Hoc River Committee Los Angeles City Council 200 N. Spring Street, Room 410 Los Angeles, CA 90012

More information

The tailed frog has been found from sea level to near timberline ( m; Province of BC 1999).

The tailed frog has been found from sea level to near timberline ( m; Province of BC 1999). TAILED FROG Name: Code: Status: Ascaphus truei A-ASTR Red-listed. DISTRIBUTION Provincial Range Tailed frogsoccur along the west coast of North America from north-western California to southern British

More information

This section provides a profile and vulnerability assessment for the flood hazard.

This section provides a profile and vulnerability assessment for the flood hazard. FLOOD This section provides a profile and vulnerability assessment for the flood hazard. HAZARD PROFILE This section provides profile information including description, location, extent, previous occurrences

More information

A final programmatic report to: SAVE THE TIGER FUND. Scent Dog Monitoring of Amur Tigers-V ( ) March 1, March 1, 2006

A final programmatic report to: SAVE THE TIGER FUND. Scent Dog Monitoring of Amur Tigers-V ( ) March 1, March 1, 2006 1 A final programmatic report to: SAVE THE TIGER FUND Scent Dog Monitoring of Amur Tigers-V (2005-0013-017) March 1, 2005 - March 1, 2006 Linda Kerley and Galina Salkina PROJECT SUMMARY We used scent-matching

More information

KNOXVILLE/KNOX COUNTY METROPOLITAN PLANNING COMMISSION USE ON REVIEW REPORT

KNOXVILLE/KNOX COUNTY METROPOLITAN PLANNING COMMISSION USE ON REVIEW REPORT KNOXVILLE/KNOX COUNTY METROPOLITAN PLANNING COMMISSION USE ON REVIEW REPORT FILE #: 1-F-17-UR AGENDA ITEM #: 62 AGENDA DATE: 1/12/2017 APPLICANT: OWNER(S): KENNY MILLER GIBBS GROOM SHOP Gibbs Ruritan Club

More information

Desplaines Valley. Mosquito Abatement District. Prepared by the Desplaines Valley Mosquito Abatement District PROVISO LYONS OAK PARK RIVERSIDE

Desplaines Valley. Mosquito Abatement District. Prepared by the Desplaines Valley Mosquito Abatement District PROVISO LYONS OAK PARK RIVERSIDE Desplaines Valley Mosquito Abatement District PROVISO RIVER FOREST OAK PARK RIVERSIDE LYONS Prepared by the Desplaines Valley Mosquito Abatement District THE DESPLAINES VALLEY Mosquito Abatement District

More information

B 500 Kiosks: B 501 and B 551

B 500 Kiosks: B 501 and B 551 B 500 Kiosks: B 501 and B 551 In Egypt, the temples of the greatest gods always housed portable, gilded boat-shaped shrines or "barks," each of which enclosed in its "cabin" a statue of its respective

More information

Click on the paper title below to link directly to it.

Click on the paper title below to link directly to it. Click on the paper title below to link directly to it. B. Endangered, Threatened, and Rare Species Effects of Roads on Bull Trout (Salvelinus confluentus), A Federally Listed Threatened Species, Emily

More information

EGULAR MEETING OF THE PLANNING COMMISSION Dearborn, Michigan. March 07, 2016

EGULAR MEETING OF THE PLANNING COMMISSION Dearborn, Michigan. March 07, 2016 EGULAR MEETING OF THE PLANNING COMMISSION Dearborn, Michigan March 07, 2016 The regular meeting was called to order at 7:03 p.m. by Chairperson Siwik. Upon roll call, the following members were present:

More information

City of Grand Ledge, Michigan Oakwood Cemetery Rules and Regulations

City of Grand Ledge, Michigan Oakwood Cemetery Rules and Regulations City of Grand Ledge, Michigan Oakwood Cemetery Rules and Regulations Introduction Oakwood Cemetery and the Oakwood Cemetery Cremains Garden are owned and operated by the City of Grand Ledge, under the

More information

Agenda Item No.: Date: January 26, 2010

Agenda Item No.: Date: January 26, 2010 Agenda Item No.: Date: January 26, 2010 CASE NUMBER: PHG 09-0047 APPLICANT: LOCATION: TYPE OF PROJECT: PROJECT DESCRIPTION: STAFF RECOMMENDATION: Niels and Sonja Rydder On the eastern side of Lomica Place,

More information

enable groups to track the occurrence of wasting disease on a local and coast wide scale.

enable groups to track the occurrence of wasting disease on a local and coast wide scale. Value of Citizen Science Monitoring Involving citizen scientists in the sea star wasting disease survey effort has greatly expanded our spatial and temporal coverage. Citizen science groups can collect

More information

HYDRAULIC DESIGN INFORMATION SHEET

HYDRAULIC DESIGN INFORMATION SHEET HYDRAULIC DSIGN INFORMAION SH Name: ABC ACRYLIC ACID PLAN Location: PASADNA, XAS Date: August 07, 2001 System No.: OSBL-2, Rev. A Contract No.: 143329774-IOC Building: OSBL-2 Contractor: DOOLY ACKABRRY,

More information

Planning and Zoning Staff Report for Ekard Conditonal Use Permit CU

Planning and Zoning Staff Report for Ekard Conditonal Use Permit CU Hearing Date: May 3, 2018 Planning and Zoning Staff Report for Ekard Conditonal Use Permit CU2018-0002 Development Services Department Owner/Applicant: James & Kerri Ekard Staff: Dan Lister, (208) 455-5959

More information

A Peek Into the World of Streaming

A Peek Into the World of Streaming A Peek Into the World of Streaming What s Streaming? Data Stream processing engine Summarized data What s Streaming? Data Stream processing engine Summarized data Data storage Funny thing: Streaming in

More information

Map: TRS: Local Number: 6B

Map: TRS: Local Number: 6B Historic Name: Avery's Dam Current Name: Street: AVERY'S _ DAM City: Corvallis County: Benton Owner: None listed Category: Site Location: Urban TRS: Quad: Corvallis Map: TLN: Addition: Unknown Block: NA

More information

s w i s s e t h i c s

s w i s s e t h i c s s w i s s e t h i c s Schweizerische Ethikkommissionen für die Forschung am Menschen Commissions d éthique suisses relative à la recherche sur l'être humain Commissioni etiche svizzere per la ricerca sull'essere

More information

4MRVWG Dog Park Committee

4MRVWG Dog Park Committee 7/19/17 WORKING DRAFT 4MRVWG Dog Park Committee I. Dog Park Committee Charge II. Information and Data Gathered to Date on Dog Park III. Regulatory and Policy Framework IV. Considerations and Range of Options

More information

REPORT ON SCOTTISH EID TRIALS

REPORT ON SCOTTISH EID TRIALS REPORT ON SCOTTISH EID TRIALS PREPARED FOR: SEERAD PREPARED BY: SAOS Ltd Rural Centre West Mains Ingliston, EH28 8NZ January 2007 CONTENTS 1. Introduction 2 Page 2. Trial Objectives. 2 3. Methodology..

More information

Eastern Box Turtle Terrapene carolina Fayetteville, Georgia Natural Area

Eastern Box Turtle Terrapene carolina Fayetteville, Georgia Natural Area Eastern Box Turtle Terrapene carolina Fayetteville, Georgia Natural Area Re-population of area cleared for agriculture/ Compared to adjacent natural area. By: Dennis E. Chase October 2011 Abstract: Introduction:

More information

For more information, see The InCalf Book, Chapter 8: Calf and heifer management and your InCalf Fertility Focus report.

For more information, see The InCalf Book, Chapter 8: Calf and heifer management and your InCalf Fertility Focus report. What is this tool? This is a gap calculator tool. It assesses the growth of a given group of heifers versus liveweight-for-age targets and its impact on reproductive performance and milksolids production.

More information

SIZING THE DAM BUSTER RAINHEAD

SIZING THE DAM BUSTER RAINHEAD 1 P a g e SIZING THE DAM BUSTER RAINHEAD 1 Size the catchment area by referring to the Dam Buster Design Guide. Follow Step 1, Step 2 and Step 3 to determine the roof catchment area design flow rate in

More information

Section III Part N Traffic Impact Report and Correspondence

Section III Part N Traffic Impact Report and Correspondence Section III Part N Traffic Impact Report and Correspondence TRAFFIC IMPACTS ADDENDUM AMSTERDAM VILLAGE GALLATING COUNTY, MONTANA Erik Garberg, P.E. December, 2014 411 East Main, Suite 101 Bozeman, MT 59715

More information

Proposal for Dog Park at Virginia Avenue Park

Proposal for Dog Park at Virginia Avenue Park Proposal for Dog Park at Virginia Avenue Park I. Overview This proposal is submitted by Capitol Canines, a neighborhood organization dedicated to establishing a dog park and natural landscaping that both

More information

Multi-Frequency Study of the B3 VLA Sample. I GHz Data

Multi-Frequency Study of the B3 VLA Sample. I GHz Data A&A manuscript no. (will be inserted by hand later) Your thesaurus codes are: 13.18.2-11.07.1-11.17.3 ASTRONOMY AND ASTROPHYSICS 3.9.1998 Multi-Frequency Study of the B3 VLA Sample. I. 10.6-GHz Data L.

More information

HOLBEACH CEMETERY CHAPELS TRUST Photography Competition 2017

HOLBEACH CEMETERY CHAPELS TRUST Photography Competition 2017 PHOTOGRAPHY COMPETITION - PLEASE READ THESE INSTRUCTIONS CAREFULLY Terms and Conditions: THE COMPETITION The Holbeach Cemetery Chapels Photo Competition (the Competition) is being run by The Holbeach Cemetery

More information

Hillside Cultivator Co. LLC Prices and Parts

Hillside Cultivator Co. LLC Prices and Parts Hillside Cultivator Co. LLC Prices and Parts Call or Email to Order 911 Disston View Dr. Lititz, PA 17543 Cell 717-669-3158 www.hillsidecultivator.com Email: shenkberryfarm@gmail.com Hillside Cultivator

More information

University of Canberra. This thesis is available in print format from the University of Canberra Library.

University of Canberra. This thesis is available in print format from the University of Canberra Library. University of Canberra This thesis is available in print format from the University of Canberra Library. If you are the author of this thesis and wish to have the whole thesis loaded here, please contact

More information

1.Heat/Suffocation 2.Natural Disasters 3.Disease 4.Chemical Residues

1.Heat/Suffocation 2.Natural Disasters 3.Disease 4.Chemical Residues Composting Catastrophic Poultry Mortality Events George (Bud) Malone Malone Poultry Consulting Major Causes of Catastrophic Losses 1.Heat/Suffocation 2.Natural Disasters 3.Disease 4.Chemical Residues Composting

More information

LEAST TERN AND PIPING PLOVER NEST MONITORING FINAL REPORT 2012

LEAST TERN AND PIPING PLOVER NEST MONITORING FINAL REPORT 2012 The Central Nebraska Public Power and Irrigation District Holdrege, Nebraska LEAST TERN AND PIPING PLOVER NEST MONITORING FINAL REPORT 2012 NOVEMBER, 2012 Mark M. Peyton and Gabriel T. Wilson, Page 1:

More information

PROGRESS REPORT for COOPERATIVE BOBCAT RESEARCH PROJECT. Period Covered: 1 October 31 December Prepared by

PROGRESS REPORT for COOPERATIVE BOBCAT RESEARCH PROJECT. Period Covered: 1 October 31 December Prepared by PROGRESS REPORT for COOPERATIVE BOBCAT RESEARCH PROJECT Period Covered: 1 October 31 December 2013 Prepared by John A. Litvaitis, Tyler Mahard, Marian K. Litvaitis, and Rory Carroll Department of Natural

More information

Mini 4-H Wildlife Project

Mini 4-H Wildlife Project Mini 4-H Wildlife Project Name Club Wildlife Project Instructions: Make 1 of the following: 1. An Animal Book 2. A Poster 3. A Model Animal 4. A Birdhouse Complete 2 of the following: 1. Word Search Puzzle

More information

PORTRAIT OF THE AMERICAN BALD EAGLE

PORTRAIT OF THE AMERICAN BALD EAGLE PORTRAIT OF THE AMERICAN BALD EAGLE Objectives: To know the history of the bald eagle and the cause of it's decline. To understand what has been done to improve Bald Eagle habitat. To know the characteristics

More information

6.1 e Cassowary Survey Nov P. Buosi

6.1 e Cassowary Survey Nov P. Buosi 6.1 e Cassowary Survey Nov. 2010 P. Buosi Ella Bay Integrated Resort Development SEIS Submission Response Volume 6 Consultant and Ella Bay Reports Our Ref: EBIRD Cass Survey Nov10_L01/PB:jw 17 February

More information

Grade 4 Science Practice Test Answer Key

Grade 4 Science Practice Test Answer Key This document contains the answer keys, rubrics, and Scoring Notes for items on the Grade 4 Science Practice Test. Additional Practice Test resources are available in the LDOE Practice Test Library. Session

More information

Kansas Department of Transportation DISTRICT C / SRTS-C030(802) Project(s): Min: Max:

Kansas Department of Transportation DISTRICT C / SRTS-C030(802) Project(s): Min: Max: Page 1 of 13 SECTION: 01 COMMON ITEMS Cat Alt Set: Cat Alt Member: LCC: 1 025323 MOBILIZATION 2 070626 MOBILIZATION (DBE) 3 020100 CONTRACTOR CONSTRUCTION STAKING 4 025324 TRAFFIC CONTROL 5 070580 FLAGGER

More information

NORTHERN GOSHAWK NEST SITE REQUIREMENTS IN THE COLORADO ROCKIES

NORTHERN GOSHAWK NEST SITE REQUIREMENTS IN THE COLORADO ROCKIES NORTHERN GOSHAWK NEST SITE REQUIREMENTS IN THE COLORADO ROCKIES WILLIAM C. SHUSTER, P.O. Box 262, Mancos, Colorado 81328 This paper deals with 20 Northern Goshawk (Accipiter gentilis) nest sites I studied

More information

Seventeenth Annual Multnomah Service Area Klondike Derby

Seventeenth Annual Multnomah Service Area Klondike Derby Seventeenth Annual Multnomah Service Area Klondike Derby At White River Snow Park Near Government Camp, Oregon Saturday February 3, 2017 9:00 am 3:00 pm Attention all Boy Scout Patrols and Webelos Dens:

More information

LOOX 12 V ESSENTIALS

LOOX 12 V ESSENTIALS PLUG AND PLAY LOOX 12 V ESSENTIALS KNOWLEDGE CREATES OPPORTUNITIES. www.hafele.co.nz ENGINEERED BY LOOX LED 2025 IDEALLY SUITED FOR TASK LIGHTING OR AS AN ALL PURPOSE DOWN LIGHT RECESS OR SURFACE MOUNTED

More information

ReproMatic & FluxxBreeder

ReproMatic & FluxxBreeder ReproMatic & FluxxBreeder the feeding system for broiler breeders REPROMATIC the feeding system especially for broiler breeders REPROMATIC is a feeding system developed by Big Dutchman to ideally meet

More information

COMMUNITY PARK AUDIT TOOL

COMMUNITY PARK AUDIT TOOL COMMUNITY PARK AUDIT TOOL Instructions Before you begin, try to locate a map of the park. Next, review the CPAT training guide and audit tool. It is important to make sure each question and response is

More information

RULES AND REGULATIONS OF LAWNRIDGE CEMETERY City of Rochelle, Illinois EFFECTIVE January 01, 2018

RULES AND REGULATIONS OF LAWNRIDGE CEMETERY City of Rochelle, Illinois EFFECTIVE January 01, 2018 RULES AND REGULATIONS OF LAWNRIDGE CEMETERY City of Rochelle, Illinois EFFECTIVE January 01, 2018 THE MANAGEMENT OF THE CEMETERY Lawnridge Cemetery is owned and operated by the City of Rochelle. Charges

More information